My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150340 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150340 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:02:01 PM
Creation date
1/6/2014 11:29:45 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-056
C150340
Contractor Name
Ridgway, Town of
Contract Type
Loan
Water District
68
County
Ouray
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER, for the Lake Otonowanda Rehabilitation Project (PROJECT) to rehabilitate <br /> Lake Otonowanda and increase the Town's raw water storage capacity. On March <br /> 19, 2013 the CWCB approved a change to the scope of work for the PROJECT. The <br /> approved change included the acquisition of property for the Renovation of Lake <br /> Otonowanda. The CWCB approved a Small Project Loan from the Construction Fund to <br /> the BORROWER in an amount up to $600,000 for PROJECT costs, not to exceed 90% of the <br /> cost of the PROJECT, with a loan origination fee of 1%, in accordance with CWCB Policy <br /> No. 16, resulting in a total loan amount of $606,000. The repayment term of the loan shall <br /> be thirty (30) years at an interest rate of 3.0% per annum. <br /> SECTION 5—SCHEDULE OF EXISTING PARITY DEBT <br /> The Town of Ridgway, a home rule municipality, acting by and through its Water Activity <br /> Enterprise currently has outstanding debt obligations. See table below. <br /> EXISTING PARITY DEBT <br /> Lender Balance Annual Payment Maturity Date <br /> DOLA —Water $69,619.69 (as of $9,795 2021 <br /> Plant 12/31/12) <br /> CWRPDA $382,500 (as of $22,500 2030 <br /> 5/1/13) <br /> The parity letter and certificates establishing that the CWCB's lien on the revenues <br /> pledged to repay this loan has parity status in relation to the liens associated with the <br /> above listed loans are incorporated herein by reference. <br /> SECTION 6—ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br /> Prior to disbursement of funds the Town shall have the necessary funds secured to <br /> finance the entire PROJECT. <br /> SECTION 7—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. Engineering contracts, plans and specifications must be submitted to the CWCB <br /> staff for verification of compliance with the terms of this CONTRACT when available <br /> prior to bidding. Any modifications to the plans and specifications must be <br /> approved in writing by the CWCB staff. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br /> by § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br /> State Engineer's Office prior to construction. <br /> Appendix 1 to Loan Contract C150340 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.