My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150371 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150371 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2015 10:53:23 AM
Creation date
12/13/2013 10:40:12 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-031
C150371
Contractor Name
Rough and Ready Irrigation Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB staff shall have the opportunity to review and approve the construction <br /> schedule. <br /> H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br /> construction, the BORROWER shall employ an inspector who has been approved by <br /> the CWCB staff. <br /> I. The BORROWER shall construct the PROJECT in accordance with the approved plans <br /> and specifications. <br /> J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., <br /> the BORROWER shall provide the as-built drawings to the State Engineer's Office for <br /> approval and filing. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br /> are due. <br /> SECTION 9—ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statements, and <br /> otherwise complying with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, including the <br /> obtaining of all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. <br /> F. Actual construction as called for in the design documents and in change orders <br /> approved by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and <br /> construction management for CWCB-approved change orders. <br /> H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the <br /> CONTRACT. <br /> I. Legal services for reviewing engineering services contracts, reviewing this <br /> CONTRACT, reviewing construction contract documents, and for complying with all <br /> federal, state, and local regulatory requirements. <br /> M. PROJECT-related expenses incurred prior to the Effective Date of this CONTRACT in <br /> accordance with the approval of this loan. <br /> 10—DISBURSEMENT SCHEDULE <br /> For Project costs: The BORROWER shall prepare a periodic progress report which <br /> contains a statement of the PROJECT costs expended for that period and shall <br /> forward said statement to the CWCB. After receipt of the periodic progress report <br /> Appendix 1 to Loan Contract C150371 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.