My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150369 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150369 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2015 9:57:11 AM
Creation date
12/13/2013 10:30:22 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-023
C150369
Contractor Name
Highland Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: HIGHLAND DITCH COMPANY <br /> CONTRACT No. C150369 <br /> AGENCY NAME: Water Conservation Board <br /> AGENCY NUMBER: PDA <br /> PROJECT AMOUNT $1,980,000 CONTRACT FORM DATE: PRIVATE/0701 13 <br /> LOAN SERVICE FEE 19,800 CWCB CMS #62179 <br /> LOAN AMOUNT $1,999,800 <br /> LOAN CONTRACT <br /> (STANDARD CONTRACT-WAIVER#160-APPROVED NOVEMBER 10,2003) <br /> THIS CONTRACT, made between the State of Colorado for the use and benefit of The <br /> Department of Natural Resources, Colorado Water Conservation Board ("CWCB" or <br /> "STATE"), and Highland Ditch Company, 4311 State Hwy 66, Longmont, Colorado, 80504, <br /> ("BORROWER"), a Colorado nonprofit corporation. <br /> FACTUAL RECITALS <br /> 1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise <br /> made available and a sufficient unencumbered balance thereof remains available for <br /> encumbering and subsequent payment of this CONTRACT under: Contract Encumbrance <br /> No. C150369, Fund Number 744, Appropriation Code P14, Organization YYYY, GBL <br /> H369, Program WTRC, Object Code 5882, Reporting Category 0369; and <br /> 2. Required approval, clearance, and coordination have been accomplished from and with <br /> appropriate agencies; and <br /> 3. On October 21, 2013 the CWCB approved a loan request from the BORROWER for the <br /> Emergency Highland Ditch System Repairs to repair damages to the main diversion <br /> structure, headgate, SCADA system, and inlet and outlet of Foothills Reservoir <br /> caused by the 2013 flood event ("PROJECT"). This loan was approved as a 30 year loan <br /> with no payments and zero interest for the first three years followed by 27 years of <br /> amortized payments at the interest rate of 1.95%. <br /> 4. The PROJECT SUMMARY attached as APPENDIX 1 and incorporated herein, contains <br /> BORROWER Information (Section 1), the Project Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval and Legislative <br /> Authorization which identifies the amount of the loan and the terms of repayment <br /> (Section 4); and <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein, the parties agree as follows: <br /> A. LOAN PROVISIONS <br /> 1. Loan Service Fee. The amount of the loan (LOAN AMOUNT) shall include (1) the <br /> amount of the funds loaned by the CWCB to the BORROWER for the PROJECT and (2) <br /> a service fee of one percent (1%) of the PROJECT amount. In the event that the <br /> BORROWER does not use the LOAN AMOUNT authorized, the parties shall amend this <br /> Loan Contract C150369 <br /> Page 1 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.