My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150361 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150361 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 1:45:48 PM
Creation date
12/13/2013 9:02:26 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-059
C150361
Contractor Name
Lone Cabin Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Please provide a brief narrative description of sources of funding, in addition to the CWCB, <br /> which have been explored for this project (Examples would be Banks, USDA Rural <br /> Development,NRCS, Colorado Water Resources and Power Development Authority, Colorado <br /> Division of Local Government,etc.). <br /> Local Banks have been approached, with short term, small loans, approved; NRCS was <br /> approached but the Company cannot afford the match required; Colorado Water River <br /> Conservation District approved a $10,000 grant; Application filed for a Water Supply Reserve <br /> Account Grant with the Gunnison Basin Roundtable, through the Colorado Water Conservation <br /> Board. <br /> A grant application to the Gunnison Basin Roundtable was approved on March 4,2013 for the <br /> amount of$38,000.At that time the Gunnison Basin Roundtable recommended to the Colorado <br /> Water Conservation Board the approval of a grant from the State Fund for the balance of the <br /> estimated costs for final design and construction oversight as well as construction costs for an <br /> amount of$232,687.The cost breakdown follows: <br /> Engineering Estimate-Final Design&Construction Oversight $ 53,500 <br /> Construction Estimate: +$230,937 <br /> Total estimated costs $284,437 <br /> GB grant - $ 38,000 <br /> CWCB grant application $232,687 <br /> A grant application for$79,444 was also filed with the Colorado River Water Conservation <br /> District but was not approved for funding. The Water Supply Reserve Account grant application <br /> for funding from the State Fund is still pending. If funding from that pending grant application <br /> is granted, the amount of the loan request to the Colorado Water Conservation Board will be <br /> adjusted or withdrawn accordingly. <br /> 4. What collateral will you be offering for this loan? Possibilities include a pledge of revenues, <br /> the project itself, real estate,water rights. <br /> Project itself,water rights and pledge of assessments. <br /> The above statements are true,to the best of my knowledge: <br /> Signature of Applicant <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.