My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150368 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150368 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:27:22 PM
Creation date
11/7/2013 7:37:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-024
C150368
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONTRACT AMENDMENT <br /> Amendment Original Loan Contract No. C150368 CORE No. CT2015-024 <br /> No.1 Original CMS No. 62154 <br /> Amendment CMS No. 83650 <br /> 1) PARTIES <br /> This Amendment No.1 (AMENDMENT) to the above-referenced ORIGINAL LOAN CONTRACT (hereinafter <br /> called the ORIGINAL CONTRACT) is entered into by and between the North Poudre Irrigation <br /> Company, 3729 Cleveland Ave., Wellington, Colorado 80549, (hereinafter called "BORROWER"), and <br /> the STATE OF COLORADO (hereinafter called the "STATE") acting by and through the Department <br /> of Natural Resources, Colorado Water Conservation Board, (hereinafter called "CWCB"). <br /> 2) EFFECTIVE DATE AND ENFORCEABILITY <br /> This AMENDMENT shall not be effective or enforceable until it is approved and signed by the <br /> Colorado State Controller or designee (hereinafter called the "EFFECTIVE DATE"), but shall be <br /> effective and enforceable thereafter in accordance with its provisions. <br /> 3) FACTUAL RECITALS <br /> The North Poudre Irrigation Company requested an increase to its existing CWCB LOAN CONTRACT <br /> NUMBER CT2015-024 for the Emergency Fossil Creek Reservoir Inlet Diversion Structure Repair <br /> (PROJECT). The Project is to repair the Fossil Creek Reservoir Inlet Diversion Structure which was <br /> damaged during the flood of September 2013. The requested increase in loan amount is due to the <br /> final design and bids received in August 2015, before survey data, geotechnical evaluation and <br /> specifications could be prepared due to damages from the flood. This request increases the existing <br /> CWCB loan amount from $481,770 to $876,680. At its September 2015 meeting, the CWCB <br /> approved increasing this loan by $394,910. A loan service fee of 1% is included in the total loan <br /> amount. <br /> 4) CONSIDERATION <br /> Consideration for this AMENDMENT to the ORIGINAL CONTRACT consists of the payments that shall be <br /> made pursuant to this AMENDMENT and ORIGINAL CONTRACT and the promises and agreements herein <br /> set forth. <br /> The Parties acknowledge that the mutual promises and covenants contained herein and other good <br /> and valuable consideration are sufficient and adequate to support this AMENDMENT. <br /> 5) LIMITS OF EFFECT <br /> This AMENDMENT iS incorporated by reference into the ORIGINAL CONTRACT, and the ORIGINAL <br /> CONTRACT and all prior amendments thereto, if any, remain in full force and effect except as <br /> specifically modified herein. <br /> 6) MODIFICATIONS. <br /> The ORIGINAL CONTRACT NO. CT2015-024 and all prior amendments thereto, if any, are modified as <br /> follows: <br /> a) Amend this contract to increase the total loan amount by $394,910 increasing the LOAN <br /> CONTRACT total amount from $481,770 to $876,680. <br /> b) The terms for the additional loan amount are a repayment period of 32 years. No payments and <br /> zero interest for five (5) years followed by twenty seven (27) years of amortized payments at the <br /> interest rate of 2.35%. A loan service fee of 1% is included in the additional loan amount, in <br /> accordance with CWCB Policy Number 16. <br /> c) Replace language in Section 7, Additional Conditions & Contract Requirements, Appendix 1, <br /> Page 2, to read: <br /> Amendment No. 1 <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.