My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150374 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150374 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2013 3:01:31 PM
Creation date
11/6/2013 1:08:45 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150374
Contractor Name
Boulder and Larimer County Irrigation and Manufacturing Ditch Company
Contract Type
Loan
Water District
4
County
Boulder
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SUMMARY <br />Boulder and Larimer Count Irrigating and Manufacturing Ditch Company <br />Contract No. C150374 <br />SECTION 1 — BORROWER INFORMATION <br />Name: Boulder and Larimer County Irrigating and Manufacturing <br />Ditch Company, a Colorado corporation <br />Address: 1004 SCR 15, Berthoud, Colorado, 80513 <br />Contact: Cindy Befus, Secretary <br />Phone Number: 970 - 532 -7178 <br />E -mail address: cbefus @msn.com <br />Type of Entity: a Colorado corporation <br />SECTION 2 — PROJECT DESCRIPTION <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan for the <br />Emergency Fossil Creek Reservoir Inlet Diversion Structure Repair to repair <br />damages to the diversion structure and inlet caused by the 2013 flood event. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />dated October 16, 2013 on the PROJECT, entitled "Emergency Funding for Damaged <br />River Diversions/Dams From the September 2013 Flood Event" which was prepared <br />by Scott Lewis, Vice President, Boulder and Larimer County Irrigating and <br />Manufacturing Ditch Company, Lakewood, Colorado and is incorporated herein by <br />reference. Based upon the feasibility report, the CWCB determined the PROJECT to <br />be technically and financially feasible. <br />SECTION 3 — CWCB'S AUTHORITY <br />Severance Tax Perpetual Base Fund. This loan is made pursuant to the provisions of <br />§§ 39- 29- 109(1)(a)(1), 37 -60 -119 and 37 -60 -120, C.R.S., which authorize the CWCB to <br />loan money for water projects from the CWCB Severance Tax Perpetual Base Fund for <br />the benefit of the people of the state, provided that the BORROWER assures repayment <br />of that money. <br />Section 37- 60- 122(1)(b), C.R.S., authorizes the CWCB to make loans of up to <br />$10,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly. <br />SECTION 4 - BOARD APPROVAL <br />At its October 2013 meeting, the CWCB approved a Small Project Loan from the <br />Severance Tax Perpetual Base Fund to the BORROWER in an amount up to $200,000 <br />for PROJECT costs, not to exceed 100% of the cost of the PROJECT, with a loan origination <br />fee of 1 % of the cost of the PROJECT, in accordance with CWCB Policy No. 16, resulting <br />in a total loan amount of $202,000 for 30 years with no payments and zero interest for <br />the first three years followed by 27 years of amortized payments at the interest rate of <br />1.90 %. <br />Appendix 1 to Loan Contract C150374 <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.