My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150377 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150377 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2015 2:46:39 PM
Creation date
10/22/2013 10:56:09 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-014
C150377
Contractor Name
Church Ditch Water Authority
Contract Type
Loan
Water District
7
County
Jefferson
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Program <br />Project Data Sheet <br />Borrower: Church Ditch Water Authority County: Jefferson <br />C150377 <br />Project Name: Leyden Creek Crossing Repair Project Type: Ditch Rehabilitation <br />Drainage Basin/ District: South Platte / 7 <br />Total Project Cost: $600,000 <br />Type of Borrower: Blended <br />CWCB Loan: $606,000 <br />(with I% service fee) <br />Water Source: Clear Creek <br />Funding Source: Severance Tax PBF <br />Average Annual Diversion: 8,355 AF <br />Interest Rate: 2.85% Term: 30 -years <br />(6% Ag, 26% Mid, 67% High, <I% Com) <br />During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br />significant number of diversion structures and dams along the river corridor were damaged <br />including the Authority's Church Ditch. Church Ditch flood repairs include restoring the Church <br />Ditch to pre -flood conditions. The Leyden Creek Crossing Structure will be rebuilt with this <br />section of the ditch piped to prevent the uncontrolled diversion of flood waters in potential future <br />events. For all areas of the ditch, sediment that was deposited by the flood will be removed and <br />the ditch banks will be reshaped where sloughing occurred. Riprap will be added to portions of <br />the reconstructed ditch banks to prevent erosion and increase protection to the ditch. <br />Standley LakeW^ <br />MLiC+I RlwK IV WV tiME4 k <br />W Y0}vt s yq.�� <br />C'HURC'H DITCH STATIS'i'1C :S <br />6 unlvn u) lk- o)g'di <br />ai=l hC'Yf d g l t c' <br />� �r 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.