Laserfiche WebLink
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3441 <br />Fax: (303) 866 -4474 <br />www. ewcb. state. co.us <br />John W. Hickenlooper <br />Governor <br />TO: Colorado Water Conservation Board Members <br />Mike King <br />DNR Executive Director <br />FROM: Jonathan Hernandez, P.E., Project Manager James Eklund <br />Kirk Russell, P.E., Chief V-biL CWCB Director <br />Finance and Administration Section <br />DATE: October 18, 2013 (Updated October 21, 2013) <br />SUBJECT: Agenda Item 8j, October 21, 2013 Special Board Meeting <br />Finance - Emergency Loans <br />Church Ditch Water Authority - Emergency Leyden Creek Crossing Repair <br />Introduction <br />The Church Ditch Water Authority (Authority) is applying for an Emergency Loan for the <br />Emergency Leyden Creek Crossing Repair Project (Project). During the unprecedented flood of <br />September 2013 in the tributaries to the South Platte River, a significant number of diversion <br />structures and dams along the river corridor were damaged. The Leyden Creek Crossing structure <br />received significant damage as a result of this flood. The purpose of the Project is to repair the <br />crossing structure to allow the Authority to convey its decreed water rights. The total Project cost is <br />estimated to be $600,000. See attached Project Data Sheet for a location map and project summary. <br />Staff Recommendation (Board approved staff recommendation on October 21, 2013) <br />Staff recommends the Board approve a loan not to exceed $606,000 ($600,000 for project cost and <br />$6,000 for the 1% service fee) to the Church Ditch Water Authority for 100% of engineering and <br />construction costs related to the Emergency Leyden Creek Crossing Repair Project from the <br />Severance Tax Perpetual Base Fund, up to the approved loan amount. The loan terms shall be 3 <br />years of no interest followed by 27 years at a blended interest rate of 2.85% per annum. Security for <br />the loan shall be in compliance with CWCB Financial Policy #5. <br />Additionally, staff recommends the following contract condition: <br />Any future grant funds obtained for the purpose of this Project shall be submitted to CWCB <br />to be applied to the balance of the loan within thirty (30) days after receipt of said funds. <br />Interstate Compact Compliance • Watershed Protection • Flood Planning & Mitigation • Stream & Lake Protection <br />Water Project Loans & Grants • Water Modeling • Conservation & Drought Planning • Water Supply Planning <br />