Laserfiche WebLink
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3441 <br />Fax: (303) 866-4474 <br />www. cwcb. state. co.us <br />TO: Colorado Water Conservation Board Members <br />FROM: Jonathan Hernandez, P.E., Project Manager <br />Kirk Russell, P.E., Chief Y6 ?-- <br />Finance and Administration Section <br />DATE: October 18, 2013 (Updated October 21, 2013) <br />John W. Hickenlooper <br />Governor <br />Mike King <br />DNR Executive Director <br />James Eklund <br />CWCB Director <br />SUBJECT: Agenda Item 8c, October 21, 2013 Special Board Meeting <br />Finance — Emergency Loans <br />Rough and Ready Irrigating Ditch Company — Emergency Rough and Ready <br />Ditch River Diversion Structure Repair <br />Introduction <br />The Rough and Ready Irrigating Ditch Company (Company) is applying for an Emergency Loan <br />for the Emergency Rough and Ready Ditch River Diversion Structure Repair Project (Project). <br />During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br />significant number of diversion structures and dams along the river corridor were damaged. The <br />Rough and Ready Ditch river diversion structure received significant damage as a result of this <br />flood. The purpose of the Project is to repair the diversion structure to allow the Company to divert <br />their decreed water rights. See attached Project Data Sheet for a location map and project summary. <br />Staff Recommendation (Board approved staff recommendation on October 21, 2013) <br />Staff recommends the Board approve a loan not to exceed $1,843,250 ($1,825,000 for project cost <br />and $18,250 for the 1% service fee) to the Rough and Ready Irrigating Ditch Company for 100% of <br />engineering and construction costs related to the Emergency Rough and Ready Ditch River <br />Diversion Structure Repair Project from the Severance Tax Perpetual Base Fund, up to the <br />approved loan amount. The loan terms shall be 3 years of no interest followed by 27 years at a <br />blended interest rate of 2.70% per annum. Security for the loan shall be in compliance with CWCB <br />Financial Policy #5. <br />Additionally, staff recommends the following contract condition: <br />Any future grant funds obtained for the purpose of this Project shall be submitted to CWCB <br />to be applied to the balance of the loan within thirty (30) days after receipt of said funds <br />Interstate Compact Compliance • Watershed Protection • Flood Planning & Mitigation • Stream & Lake Protection <br />Water Project Loans & Grants • Water Modeling • Conservation & Drought Planning • Water Supply Planning <br />