My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150375 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150375 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2015 11:15:50 AM
Creation date
10/22/2013 10:56:08 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-010
C150375
Contractor Name
Consolidated Home Supply Ditch and Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Program <br />Project Data Sheet 0150375 <br />Borrower: Consolidated Home Supply Ditch County: Larimer <br />& Reservoir Company <br />Project Name: Big Dam Diversion Structure Project Type: Diversion Rehabilitation <br />Repair <br />Drainage Basin/ District: South Platte / 4 Water Source: Big Thompson River <br />Total Project Cost: $1,600,000 <br />Type of Borrower: Blended <br />CWCB Loan: $1,616,000 <br />(with I% service fee) <br />Funding Source: Severance Tax PBF <br />Average Annual Diversion: 22,000 AF <br />Interest Rate: 1.95% Term: 30 -years <br />(76% Ag, 23% Mid, <1% High, <1% Com) <br />During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br />significant number of diversion structures and dams along the river corridor were damaged <br />including the Company's "Big Dam" diversion structure. During the flood, the top five feet of <br />the masonry structure was washed out and the mortar between masonry blocks on the north <br />abutment was partially lost. Field observations show that the river was overtopping the structure <br />by approximately 10 feet. The purpose of this project is to restore the "Big Dam" diversion <br />structure to its pre -flood crest elevation while improving the structural integrity of the structure. <br />iharim A .. 2 <br />State <br />Park <br />Horsetoadi <br />Weights <br />!?; Redmond <br />Site Location <br />934 J . - .. <br />W ist St Loveland <br />I: <br />a <br />LED <br />Tampion <br />SYP Welty <br />14� 87{ <br />ro.nr <br />Windsor <br />erxewek <br />F <br />W 4th St <br />ac <br />- <br />[\ <br />County Road 54 <br />Tt <br />Elm <br />Johnstown <br />Milliken <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.