Laserfiche WebLink
CWCB Water Project Loan Program <br />Project Data Sheet <br />Borrower: Ish Reservoir Company <br />Project Name: Inlet Ditch & Diversion <br />Structure Repair <br />Drainage Basin/ District: South Platte / 6 <br />Total Project Cost: $205,000 <br />Type of Borrower: Blended <br />CWCB Loan: $207,050 <br />(with I% service fee) <br />County: Boulder <br />AKIT-Yll <br />Project Type: Diversion Rehabilitation <br />Water Source: Little Thompson River <br />Funding Source: Severance Tax PBF <br />Average Annual Diversion: 4,500 AF <br />Interest Rate: 1.75% Term: 30-years <br />(99% Ag, <1% Mid, <1% Com) <br />Project consists of the repair of the diversion structure and Ish Reservoir inlet. The scope of <br />work for the diversion structure involves removing debris from the dam and inlet structure, <br />forming and pouring a new wing wall on the north side of the diversion darn, and then <br />rechanneling the Little Thompson River to flow back over the diversion dam. <br />The scope of work for inlet washout repairs involves creating a new path for the Company's <br />ditch through this area. This involves creating a permanent foundation secured to bedrock and <br />building a new water conveyance system on top of this foundation. <br />14 sob tmt* <br />Johnstown <br />Blida <br />r. <br />tar °mom <br />,;1sh Reservoir <br />Maio, <br />H? <br />126 <br />Mead <br />T" <br />C. Itaid 54 <br />W~ A- <br />C—tv Rw.t 34 <br />Flats <br />Longmont.. <br />