Laserfiche WebLink
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3441 <br />Fax: (303) 866-4474 <br />www. cwc b. state. co.us <br />DATE: October 18, 2013 (Updated October 21, 2013) <br />SUBJECT: Agenda Item 8f, October 21, 2013 Special Board Meeting <br />Finance — Emergency Loans <br />Boulder and Larimer County Irrigating and Manufacturing Ditch Company — <br />Emergency Boulder and Larimer Diversion Structure Repair <br />Introduction <br />The Boulder and Larimer County Irrigating and Manufacturing Ditch Company (Company) is <br />applying for an Emergency Loan for the Emergency Boulder and Larimer Diversion Structure <br />Repair Project (Project). During the unprecedented flood of September 2013 in the tributaries to the <br />South Platte River, a significant number of diversion structures and dams along the river corridor <br />were damaged. The purpose of this Project is to repair the diversion structure and inlet shared by <br />the Company and the Ish Reservoir Company to give both Companies the ability to deliver water to <br />shareholders. The Company will share the cost of the Project with Ish Reservoir Company. See <br />attached Project Data Sheet for a location map and project summary. <br />Staff Recommendation (Board approved staff recommendation on October 21, 2013) <br />Staff recommends the Board approve a loan not to exceed $202,000 ($200,000 for project cost and <br />$2,000 for the 1% service fee) to the Boulder and Larimer Irrigating and Manufacturing Ditch <br />Company for 100% of engineering and construction costs related to the Emergency Boulder and <br />Larimer Diversion Structure Repair Project from the Severance Tax Perpetual Base Fund, up to the <br />approved loan amount. The loan terms shall be three years of no interest followed by 27 -years at a <br />blended interest rate of 1.90% per annum. Security for the loan shall be in compliance with CWCB <br />Financial Policy #5. <br />Staff additionally recommends the following contract condition: <br />Any future grant funds obtained for the purpose of this Project shall be submitted to CWCB to be <br />applied to the balance of the loan within thirty (30) calendar days after receipt of said funds. <br />Interstate Compact Compliance • Watershed Protection • Flood Planning & Mitigation • Stream & Lake Protection <br />Water Project Loans & Grants • Water Modeling • Conservation & Drought Planning • Water Supply Planning <br />John W. Hickenlooper <br />Governor <br />TO: Colorado Water Conservation Board Members <br />Mike King <br />FROM: Anna Mauss, P.E., Project Manager e?"-- -- <br />DNR Executive Director <br />Kirk Russell, P.E., Chief <br />James Eklund <br />CWCB Director <br />Finance and Administration Section <br />DATE: October 18, 2013 (Updated October 21, 2013) <br />SUBJECT: Agenda Item 8f, October 21, 2013 Special Board Meeting <br />Finance — Emergency Loans <br />Boulder and Larimer County Irrigating and Manufacturing Ditch Company — <br />Emergency Boulder and Larimer Diversion Structure Repair <br />Introduction <br />The Boulder and Larimer County Irrigating and Manufacturing Ditch Company (Company) is <br />applying for an Emergency Loan for the Emergency Boulder and Larimer Diversion Structure <br />Repair Project (Project). During the unprecedented flood of September 2013 in the tributaries to the <br />South Platte River, a significant number of diversion structures and dams along the river corridor <br />were damaged. The purpose of this Project is to repair the diversion structure and inlet shared by <br />the Company and the Ish Reservoir Company to give both Companies the ability to deliver water to <br />shareholders. The Company will share the cost of the Project with Ish Reservoir Company. See <br />attached Project Data Sheet for a location map and project summary. <br />Staff Recommendation (Board approved staff recommendation on October 21, 2013) <br />Staff recommends the Board approve a loan not to exceed $202,000 ($200,000 for project cost and <br />$2,000 for the 1% service fee) to the Boulder and Larimer Irrigating and Manufacturing Ditch <br />Company for 100% of engineering and construction costs related to the Emergency Boulder and <br />Larimer Diversion Structure Repair Project from the Severance Tax Perpetual Base Fund, up to the <br />approved loan amount. The loan terms shall be three years of no interest followed by 27 -years at a <br />blended interest rate of 1.90% per annum. Security for the loan shall be in compliance with CWCB <br />Financial Policy #5. <br />Staff additionally recommends the following contract condition: <br />Any future grant funds obtained for the purpose of this Project shall be submitted to CWCB to be <br />applied to the balance of the loan within thirty (30) calendar days after receipt of said funds. <br />Interstate Compact Compliance • Watershed Protection • Flood Planning & Mitigation • Stream & Lake Protection <br />Water Project Loans & Grants • Water Modeling • Conservation & Drought Planning • Water Supply Planning <br />