Laserfiche WebLink
Left Hand Ditch Company <br />October 18, 2013 (Updated October 21, 2013) <br />Page 4 of 7 <br />Agenda Item 8b <br />Project Description <br />The purpose of this loan request is to restore the Company system it its pre -flood condition. <br />The Company has retained Duane H. Smith, P.E. of Smith Geotechnical/Engineering Consultants as <br />the primary engineer for this project. Because of the extensive nature of the damage to the system, <br />and the urgency to move forward on various components simultaneously, the Company may retain <br />other Professional Engineers to develop plans and designs for individual structural project <br />components. <br />Alternatives considered were: <br />Alternative 1 — Do Nothing: Failure to repair the Left Hand Ditch system would lead to the <br />abandonment of multiple water rights within the system. Numerous irrigators within the system <br />would unable to receive water. The Company would not be able to supply water to the Left Hand <br />Water District which would harm the potable water supply for the Left Hand Valley area. <br />Alternative 2 — Rebuilding Collaboratively with Improvements: The Company identified flood <br />mitigation measures and possible fish passage structures that could enhance its system beyond its <br />pre -flood condition. Depending on the availability of funding and the feasibility of enhancements, <br />the Company would be willing to consider implementing these items on a case by case basis. <br />However, because funding sources for enhancements are unidentified, implementing this alternative <br />is not practicable at this time. <br />Selected Alternative 3 — Restore system to pre -flood condition: <br />Left Hand Creek Parshall Flume and Recorder Station <br />• Replace Parshall flume and recorder station. Ensure device operates to EO's Standards. <br />Left Hand Valley Reservoir <br />• Debris removal at the inlet into the lake. <br />• Repair Dam spillway, dam access road, secondary spillway. <br />Left Hand Valley Diversion <br />• Restore Left Hand Creek to its pre -flood channel in this area. <br />• Repair Left Hand Valley filler ditch. Ensure measuring device operates to SEO's Standards. <br />Crocker Ditch <br />• Restore Left Hand Creek to its pre -flood channel in this area. <br />• Remove debris from ditch. Ensure device operates to SEO's Standards. <br />Allen's Lake Filler Canal Head Gate (Also Lake Ditch inlet and Toll Gate Ditches headgate) <br />• Survey and design new dam and headgate structure. <br />• Replace diversion dam and headgate structure. Ensure device operates to SEO's Standards. <br />• Coordinate with Boulder County Transportation. <br />• Perform grade survey to determine if the Parshall Flume is still useable. <br />• Replace upper section of the ditch <br />Allen's Lake Filler Canal at Geer Canyon Road <br />• Replace culvert where ditch crosses Geer Canyon at road. <br />• Remove debris in this area. <br />Table Mountain Ditch <br />