My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150370 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150370 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2015 4:27:28 PM
Creation date
10/22/2013 10:56:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-008
C150370
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3441 <br />Fax: (303) 866-4474 <br />www.cwcb.state.co.us <br />John W. Hickenlooper <br />Governor <br />TO: Colorado Water Conservation Board Members <br />Mike King <br />DNR Executive Director <br />FROM: Anna Mauss, P.E., Project Manager James Eklund <br />Kirk Russell, P.E., Chief Og— CWC13 Director <br />Finance and Administration Section <br />DATE: October 18, 2013 (Updated October 21, 2013) <br />SUBJECT: Agenda Item 8b, October 21, 2013 Special Board Meeting <br />Finance — Emergency Loans <br />Left Hand Ditch Company — Emergency Left Hand Ditch System Repairs <br />Introduction <br />The Left Hand Ditch Company (Company) is applying for an Emergency Loan for the Emergency <br />Left Hand Ditch System Repairs Project (Project). During the unprecedented flood of September <br />2013 in the tributaries to the South Platte River, a significant number of diversion structures and <br />dams along the river corridor were damaged. Sections of the Company's system were entirely <br />wiped out and other portions were severely damaged. The purpose of this Project is to restore the <br />system water can be delivered to shareholders. The Company's total Project cost is estimated to be <br />$3,243,620. See attached Project Data Sheet for a location map and project summary. <br />Staff Recommendation (Board approved staff recommendation on October 21, 2013) <br />Staff recommends the Board approve a loan not to exceed $3,276,056 ($3,243,620 for project cost <br />and $32,436 for the 1% service fee) to the Left Hand Ditch Company for 100% of engineering and <br />construction costs related to the Emergency Left Hand Ditch System Repairs Project from the <br />Severance Tax Perpetual Base Fund, up to the approved loan amount. The loan terms shall be three <br />years of no interest followed by 27 -years at a blended interest rate of 2.30% per annum. Security for <br />the loan shall be in compliance with CWCB Financial Policy #5. <br />Staff additionally recommends the following contract condition: <br />Any future grant funds obtained for the purpose of this Project shall be submitted to CWCB to be <br />applied to the balance of the loan within thirty (30) calendar days after receipt of said funds. <br />Interstate Compact Compliance • Watershed Protection • Flood Planning & Mitigation • Stream & Lake Protection <br />Water Project Loans & Grants • Water Modeling • Conservation & Drought Planning • Water Supply Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.