My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150370 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150370 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2015 4:27:28 PM
Creation date
10/22/2013 10:56:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-008
C150370
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Program <br />Project Data Sheet <br />Borrower: Left Hand Ditch Company <br />Project Name: Left Hand Ditch System <br />Repairs <br />Drainage Basin/ District: South Platte / 5 <br />Total Project Cost: $3,243,620 <br />Type of Borrower: Blended <br />County: Boulder <br />C150370 <br />Project Type: Ditch Rehabilitation <br />Water Source: Left Hand & <br />St. Vrain Creeks <br />Funding Source: Severance Tax PBF <br />Average Annual Diversion: 22,700 AF <br />CWCB Loan: $3,276,056 Interest Rate: 2.30% Term: 30 -years <br />(with I% service fee) (46% Ag, 38% Mid, 16% High) <br />The Company plans to restore its system to pre -flood condition which includes: Replacement of <br />Left Hand Creek Parshall Flume and Recorder Station, repair of Left hand Valley Diversion <br />repair of several ditchs: Crocker, Table mountain, Bader, Hunman, Star, Holland, Williamson, <br />and Gold Lake Filler Ditch, replace the diversion dam and headgate structure at Allen's Lake <br />Filler Canal Head Gate <br />
The URL can be used to link to this page
Your browser does not support the video tag.