Laserfiche WebLink
Table 1 is a summary of the Project goals, obstacles and findings: <br /> Success of meeting previously The first half of the installations is <br /> identified goals and objectives ahead of schedule. <br /> Obstacles Encountered None <br /> Preliminary findings or <br /> Accomplishments None <br /> Potential need for revision to the <br /> scope of work and timeline Timeline shall be shortened. <br /> As of the date of this report, the goals and objectives of this project have been met. Most of the <br /> existing meter pits were in relatively good condition. <br /> The timeline for this project is ahead of schedule and has been altered accordingly. A small <br /> sample of the existing meters shall be retained for testing, as part of the final report. <br /> A copy of the timeline is also attached. <br /> The total area in the 75% Complete 2013 Meter Replacement Project was 0.47 square miles. <br /> fivrk" / /F/; i3 <br /> Kenneth Alan Young, Colorado Registered Professional Engineer#33405 Date <br />