My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
StCharlesMesa_MeterRplcmntPhase3_50%PR
CWCB
>
Water Efficiency Grants
>
Day Forward
>
StCharlesMesa_MeterRplcmntPhase3_50%PR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2013 3:01:31 PM
Creation date
10/21/2013 2:17:44 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Implementation Grant
Contract/PO #
OE PDA 14-13
Applicant
St Charles Mesa Water District
Project Name
Meter Replacement Program Phase 3
Title
50% Progress Report
Date
9/27/2013
County
Pueblo
Water Efficiency - Doc Type
Interim Reports
Document Relationships
StCharlesMesa_MeterRplcmntPhase3_75%PR
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase3_Applic
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase3_ApprvlLtr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase3_FinalReport
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase3_Invoice
(Message)
Path:
\Water Efficiency Grants\Day Forward
StCharlesMesa_MeterRplcmntPhase3_PO
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1 is a summary of the Project goals, obstacles and findings: <br /> Success of meeting previously The first half of the installations is <br /> identified goals and objectives ahead of schedule. <br /> Obstacles Encountered Wet Weather. <br /> Preliminary findings or On one single day,over 60 meters <br /> Accomplishments were replaced. <br /> Potential need for revision to the <br /> scope of work and timeline Timeline shall be shortened. <br /> As of the date of this report, the goals and objectives of this project have been met. Most of the <br /> existing meter pits were in relatively good condition. <br /> • <br /> The timeline for this project is ahead of schedule and has been altered accordingly. A small <br /> sample of the existing meters shall be retained for testing, as part of the final report. <br /> A copy of the timeline is also attached. <br /> The total area in the first half of the 2013 Meter Replacement Project was 0.18 square miles. <br /> , 9/2",/aeri,3 <br /> t � ` <br /> Kenneth Alan oung, Colored', 'egister Professional Engineer#33405 Date <br /> �.�0.,•1�, !►lay••, ¢1, <br /> C•`4`4 Acs;t�` <br /> vic 33405 0: <br /> -7147/1118101. <br />