My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150363 Feasibilty Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150363 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:19:46 PM
Creation date
10/1/2013 2:25:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150363
CT2015-001
Contractor Name
Petrocco Family Limited Partnership, LLLP
Contract Type
Loan
Water District
2, 3
County
Adams
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Selected Alternative <br />Petrocco Farms has chosen Alternative #2 as the desired alternative. Petrocco Farms <br />does not feel that the other alternatives meet the goals of the project or add a level of <br />efficiency, value, or long term water reliability, as compared to Alternative #2. <br />Alternative # 2 meets the project goals by enabling Petrocco Farms to guarantee a more <br />reliable water supply for more of their agriculture operation and enhance their ability to <br />provide marketable produce at a reasonable cost. It will also provide an assurance that no <br />municipality will be able to dry up the shares of water historically leased by Petrocco <br />Farms at the Project Farm locations. This alternative will enhance Petrocco Farms ability <br />to maintain their long term family owned farming operation. <br />Project Cost <br />The selected alternative is estimated to cost a total of $925,000 including planning, water <br />engineering and transaction fees. The project cost estimate is shown in Table 1 above. <br />Implementation Schedule <br />The following schedule is proposed for implementation of the project: <br />Task <br />1. Feasibility Study Submittal <br />2. CWCB Loan Approval <br />3. CWCB Contract Approval <br />4. Water Share Purchase Transaction <br />5. First CWCB Loan Payment Due <br />Social, Economic and Physical Impacts <br />The project will have no significant social impacts. <br />Target Date <br />August 1, 2013 <br />September 25, 2013 <br />December 24, 2013 <br />December 26, 2013 <br />December 26, 2014 <br />The project will have a positive economic impact on Petrocco Farms by providing a more <br />reliable water supply for their farms and in the long term reducing their expenses <br />associated with leasing irrigation water. <br />The project will have no significant physical impacts other than the shares of water <br />purchased, and currently flowing in the ditches, will be used at different locations, thus <br />possibly requiring some physical adjustments to be made to the ditch system. <br />Permitting <br />No permits are required in order to complete the project. <br />