Laserfiche WebLink
Lone Cabin Ditch & Reservoir Company <br />September 13, 2013 (UPDATED September 26, 2013) <br />Page 5 of 7 <br />Agenda Item 29c <br />and the consumptive needs of the Gunnison Basin by rehabilitating existing infrastructure to preserve <br />agricultural water use. <br />Reporting and Deliverables: All products, data and information developed as a result of this grant <br />must be provided to CWCB in hard copy and electronic format as part of the project <br />documentation. This information will in turn be made widely available to Basin Roundtables and <br />the general public and will help promote the development of a common technical platform. <br />In accordance with the revised WSRA Criteria and Guidelines, staff would like to highlight <br />additional reporting and final deliverable requirements provided below: <br />Reporting_ The applicant shall provide the CWCB a progress report every 6 months, <br />beginning from the date of the executed contract. The progress report shall describe the <br />completion or partial completion of the tasks identified in the scope of work including a <br />description of any major issues that have occurred and any corrective action taken to address <br />these issues. <br />Final Deliverable: At completion of the project, the applicant shall provide the CWCB a <br />final report that summarizes the project and documents how the project was completed. <br />This report may contain photographs, summaries of meetings and engineering <br />reports /designs. <br />Engineering All engineering work (as defined in the Engineers Practice Act ( §12 -25- <br />102(10) C.R.S.)) performed under this grant shall be performed by or under the responsible <br />charge of professional engineer licensed by the State of Colorado to practice Engineering. <br />