Santa Maria Reservoir Company Agenda Item 29b <br />September 13, 2013 (Updated September 26, 2013) <br />Page 3 of 7 <br />Water Rights <br />The Company's decreed water rights include 37,515 AF of storage in Santa Maria Reservoir (1916 <br />priority date), 26,716 AF of storage in Continental Reservoir (1934 priority date), and 275 cfs of <br />direct flow rights from North Clear Creek, Bennett Creek, and Bolder Creek. On average the <br />Company diverts 6,300 AF annually. <br />The CWCB has filed a statement of opposition to the Company's water court application to change <br />the use of certain storage rights in Santa Maria Reservoir. Staff intends to work with the <br />Company's representatives to ensure that the resulting decree contains terms and conditions to <br />prevent injury to any decreed instream flow water rights while allowing the Company's proposal to <br />move forward. <br />Project Description <br />The objective of this Project is to rehabilitate the Continental dam and restore the full storage <br />capacity of the reservoir. <br />Several options were evaluated to address the spillway project including: no action, complete <br />replacement of the spillway, and rehabilitation of the existing spillway. Rehabilitating the existing <br />spillway was selected as it had the lowest cost while still safely passing the required design flood. <br />Several options were also evaluated to address the seepage from the embankment. These <br />alternatives included grouting the left abutment, grouting the dam embankment, and constructing an <br />internal seepage collection system along the downstream dam face. Because of unknowns with <br />grouting, the Company selected the internal seepage collection system as the preferred alternative. <br />Final engineering documents have been prepared and were used for estimating the total project cost. <br />TABLE 1: TOTAL PROJECT COST SUMMARY <br />Task <br />Cost <br />Construction (with 12% contingency) <br />$3,584,000 <br />Construction Engineering Support <br />$431,000 <br />Admin <br />$40,000 <br />Total --7$4,055,000 <br />Schedule: The Project schedule is as follows: bid the Project in spring of 2014; construction in the <br />summer /fall of 2014. <br />TABLE 2: PROJECT FUNDING SUMMARY <br />WSRA Grant <br />Rio Grande River Basin (5% of WSRA Grant Request) $51,000 <br />Statewide (95% of WSRA Grant Request) $962,750 <br />TOTAL(25% of the Total Project Cost) $1,031,750 <br />CWCB Construction Fund Loan (75% of Total Project Cost) $3,041,250 <br />Total Project Cost 1 $4,055,000 <br />The CWCB will disburse funds at a rate of 75% loan to 25% grant of each invoice amount for <br />Project related expenses, up to the approved grant and loan limits. <br />