My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150365 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150365 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:23:10 PM
Creation date
10/1/2013 2:25:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150365
CT2015-006
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
20
County
Hinsdale
Mineral
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Project Loan Program <br />Project Data Sheet <br />Borrower: Santa Maria Reservoir Company County: Hinsdale & Mineral <br />Project Name: Continental Dam Spillway Project Type: Dam Rehabilitation <br />Restoration Project <br />Drainage Basin: Rio Grande / District 20 Water North Clear Creek <br />Source: <br />Total Project $4,055,000 Funding Construction Fund and <br />Cost: Source: Water Supply Reserve <br />Account Grants <br />Type of Agricultural Avg. Annual 6,300 AF <br />Borrower: Diversion: <br />Recovered 12,000 AF <br />Storage: <br />CWCB Loan: $3,071,633 (w/ 1% service fee) Interest Rate: 1.75% Term: 30 years <br />Santa Maria Reservoir Company owns and operates Continental Reservoir (27,000 AF) and <br />Santa Maria Reservoir (43,500 AF), located in the Rio Grande River Basin near Creede, <br />Colorado. Santa Maria and Continental operate in conjunction with each other via a conveyance <br />system made up of a pipeline, siphon, and open ditch. For the past 20 years, Continental has <br />been under a storage restriction due to seepage issues, limiting the storage to 15,000 AF. The <br />purpose of this Project is to address seepage issues and repair the spillway Continental Reservoir <br />in order to lift the storage restriction. Construction is expected to occur in the 2014 construction <br />season. <br />
The URL can be used to link to this page
Your browser does not support the video tag.