My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150334 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150334 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2015 12:52:27 PM
Creation date
10/1/2013 2:25:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-044
C150334
Contractor Name
McDonald Ditch Company
Contract Type
Loan
County
Rio Grande
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
McDonald tch Company Agenda Item 28b <br />September 1 , 2013 (Updated September 30, 2013) <br />Page 2 of 4 <br />The Mcl lonald Ditch diversion structure and headgate is located seven miles northwest of Monte Vista, <br />Colorad on the Rio Grande River and was constructed over forty years ago. The company's service <br />area iffig ates 1,320 acres. Its diversion and headgate structures were poorly designed and are rapidly <br />deterior a -.ing, presenting a growing maintenance burden for the Company. Both the diversion and <br />headgatc were highlighted as river rehabilitation priorities in a 2001 study titled "Rio Grande <br />Headwa l -,rs Restoration Project." The study analyzed the condition of riparian habitats and structures <br />along a 1 -mile reach of the Rio Grande from the town of South Fork to Alamosa and triggered a more <br />localizec effort known as the Plaza Project. <br />The Pla2 a Project is a multi - phased project intended to improve the health and function of the Rio <br />Grande I tiver in the Sevenmile Plaza area through stream bank restoration, wetland restoration, and the <br />replacen ent of aging and inefficient diversion and headgate structures. Phase 1 was a planning phase <br />and ide ified the McDonald diversion and headgate structures as in need of replacement. Phase 2 of the <br />Plaza Pr ject (McDonald Ditch Implementation Project) includes the final engineering design and <br />construc ion of the new diversion and headgate as well as stream bank stabilization, wetland <br />reclamal ion, monitoring, outreach and education. The Company is responsible for a portion of the funds <br />that will cover only the McDonald diversion and headgate replacement (Tasks 2 and 3 of the Phase 2 <br />Plaza Pr iect). <br />The Pro ect funding comes from a variety of grants, this CWCB loan, and in -kind services. The <br />Colorad Rio Grande Restoration Foundation (Foundation) received approval of a Water Supply <br />Reserve Account (WSRA) Grant to help finance the Plaza Project Phase 2: McDonald Ditch <br />Implem ntation Project in September 2011 (contract C150492). The Foundation is seeking a grant <br />increasel concurrent with the Company seeking this loan increase. <br />Project Update <br />During he final engineering design of the McDonald Ditch diversion structure, analysis showed that <br />rebuildi ig the diversion structure at the existing location would cause flooding in the local community <br />includir g the upstream bridge of W CR 5 N ( Sevenmile Plaza Bridge). The solution is to build the new <br />dam an headgate upstream of the bridge, in a more stable channel reach, pipe the water to the ditch, <br />and rep ace the existing dam with a rock weir to maintain channel grade at the bridge. This diversion <br />structur, will be equipped with a sluice gate as well as a fish and boat passage. Phase 2 has increased by <br />$468,0 for an estimated total cost of $1,376,000. Table 1 provides an updated cost summary of the <br />larger P iase 2 project. <br />TABLE 1: PLAZA PROJECT PHASE 2 COST SUMMARY <br />Task <br />Original <br />Revised <br />Task 1: Finalize Design <br />$101,500 <br />$108,000 <br />Task 2: McDonald Ditch Diversion Replacement <br />$427,500 t <br />$644,800 2 <br />Task 3: McDonald Ditch Headgate Replacement <br />$222,500 t <br />$440,4002 <br />Task 4: Channel Shaping and Stream bank Stabilization <br />$40,000 ' <br />$64,800 2 <br />Task 5: Wetland Reclamation (Completed) <br />$65,000 ' <br />$66,000 <br />Task 6: Monitoring <br />$3,700 <br />$3,800 <br />Task 7: Outreach and Education <br />$3,500 <br />$3,500 <br />Task 8: Administration <br />$44,300 <br />$44,700 <br />Task 2 & 3 (Loan Project) Total <br />$650,000 <br />$1,085,000 <br />Plaza Project Phase 2 Total <br />$908,000 <br />$1,376,000 <br />' Costs based on "Means Heavy Construction Cost Data " utilized by NRCS <br />2 Costs based on Pre -Bids submitted by Contractors <br />
The URL can be used to link to this page
Your browser does not support the video tag.