My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153623 Extension Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153623 Extension Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 1:47:36 PM
Creation date
10/1/2013 8:36:27 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153623
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Water District
24
County
Costilla
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sanchez Ditch and Reservoir Agenda Item 23c <br />September 18, 2012 (Updated October 4, 2012) <br />Page 3 of 8 <br />The Company's decreed water rights are dated from 1856 and go through 1934 for a total of 373.95 <br />cfs. Sanchez Reservoir specifically has a decreed storage right of 103,155 AF. On average the <br />Company delivers 15,000 AF annually. <br />Project Description <br />The objective of this Project is to address the safety and operational management concerns at the <br />reservoir by demolishing the gate tower and modifying the outlet works. <br />Several alternatives were considered including: 1) repairing the tower and conduit and upgrading <br />the gates and control system; 2) repairing the tower and replacing the existing tower gates with four <br />larger gates; 3) demolishing the tower and replacing the outlet conduit with a new intake structure; <br />and, 4) the do- nothing alternative. Additional options were also investigated to improve the tower <br />access by the installation of a pedestrian bridge or the installation of a ladder on the outside of the <br />tower. <br />The Company chose alternative 3 to demolish the tower. This alternative includes: demolition of <br />the gate tower; the installation of new control gates and operators; lining the existing outlet conduit <br />with shotcrete; repairing the downstream outlet structure; and, installing a new perimeter drain and <br />weir along the right side of the outlet structure to control seepage. <br />Preliminary engineering documents have been prepared and used for estimating the total project <br />cost summary as provided in Table 1. <br />TABLE 1: TOTAL PROJECT COST SUMMARY <br />Task <br />Cost <br />Final Engineering and Construction Management <br />$225,000 <br />Construction <br />$1,528,000 <br />Contingency <br />$279,000 <br />Total <br />$2,032,000 <br />The Project schedule is as follows: final design and State Engineer's Office (SEO) approval <br />between January 2013 and January 2014; bid the project in May of 2014; award the bid by June of <br />2014; start construction in September of 2014; complete construction by March of 2015. <br />TABLE 2: PROJECT FUNDING SUMMARY <br />WSRA Grant <br />Rio Grande River Basin <br />$55,000 <br />Statewide <br />$859,400 <br />TOTAL <br />$914,400 <br />CWCB Construction Fund Loan <br />$1,117,600 <br />Total Project Cost <br />$2,032,000 <br />CWCB will disburse funds at a rate of 55% loan to 45% grant of each invoice amount for Project <br />related expenses, up to the approved limit of $2,032,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.