My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153623 Extension Letter
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153623 Extension Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 1:47:36 PM
Creation date
10/1/2013 8:36:27 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153623
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Water District
24
County
Costilla
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sanchez Ditch and Reservoir <br />September 18, 2012 (Updated October 4, 2012) <br />Page 8 of 8 <br />Agenda Item 23c <br />allowing interest only payments for the first five years, the debt service would have otherwise <br />reached $4.48 /share. <br />TABLE 5: FINANCIAL RATIOS <br />Collateral: As security for the loan, the Company will pledge assessment revenues backed by a <br />rate covenant and annual financial reporting and the undivided one hundred percent (100 %) interest <br />in and to the Sanchez Dam and Reservoir and all appurtenant structures thereto, including all lands <br />on which these facilities are located. This is in compliance with the CWCB Financial Policy #5 <br />(Collateral). <br />cc: Jerry Lorenz, President, Sanchez Ditch and Reservoir Company <br />Susan Schneider, AGO <br />Peter Johnson, AGO <br />Attachment: Water Project Loan Program — Project Data Sheet <br />Future <br />Financial Ratio <br />2009 -2011 <br />w/ Project <br />2020+ <br />Operating Ratio (operating revenues /operating expenses) <br />108% <br />107% <br />(average) <br />(average) <br />weak: <100% 1 - I average: 100% - 120% - 1 strong: >120% <br />$237K/$220K <br />$265K/$247K <br />Debt Service Coverage Ratio <br />149% <br />129% <br />(total eligible revenues - operating expenses) /total debt service <br />(strong) <br />(strong) <br />weak: <100% 1 - I average: 1000/0 - 120% 1 - I Strong7> 1200/ <br />($237K4185K)/$35K <br />($265K4185K)/$62K <br />Cash Reserves to Current Expenses <br />69% <br />61% <br />(average) <br />(average) <br />weak: <50% - avera e: 50% - 100% - stron : >100% <br />$151 K/$220K <br />$151 K/$247K <br />Annual Operating Cost per Acre -Foot (based on 15,000 AF) <br />$14.67 <br />$16.47 <br />average: $10 - $20 - strong: <$10 <br />(average) <br />(average) <br />$220K/15,000 <br />$247K/15,000 <br />Collateral: As security for the loan, the Company will pledge assessment revenues backed by a <br />rate covenant and annual financial reporting and the undivided one hundred percent (100 %) interest <br />in and to the Sanchez Dam and Reservoir and all appurtenant structures thereto, including all lands <br />on which these facilities are located. This is in compliance with the CWCB Financial Policy #5 <br />(Collateral). <br />cc: Jerry Lorenz, President, Sanchez Ditch and Reservoir Company <br />Susan Schneider, AGO <br />Peter Johnson, AGO <br />Attachment: Water Project Loan Program — Project Data Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.