Laserfiche WebLink
Section <br />Summary — Ogilvy Augmentation Company — Contract No. <br />C150273 <br />— BORROWER INFORMATION <br />Name: Ogilvy Augmentation Company <br />Address: 822 7t' Street, Suite 760, Greeley, CO 80631 <br />Contact: Doug Seely <br />Phone Number: 970 - 988 -1459 <br />E -mail address: dougseely@msn.com <br />Type of Entity: a Colorado nonprofit corporation <br />— Project Description <br />A. D scription of PROJECT: The BORROWER applied to the CWCB for a loan to be <br />ui ied for the construction of the Ogilvy Augmentation Company Well <br />A igmentation Project, located in Weld County, hereinafter referred to as the <br />P tOJEcT, at an estimated total cost of $1,112,000. <br />B. D 3scription of Feasibility Study: The CWCB has reviewed a feasibility study report <br />oi i the PROJECT entitled "Feasibility Study of the Ogilvy Augmentation Company <br />ell Augmentation Project," dated August 2008, compiled by Doug Seely, P.E., <br />w iich is incorporated herein by reference, and, based upon the feasibility report, the <br />C CB determined the PROJECT to be technically and financially feasible. <br />SECTION 13 — CWCB'S AUTHORITY <br />Sevelrance Tax Trust Fund Perpetual Base Account. This loan is made pursuant to <br />the girovisions of §§ 39- 29- 109(1xaxl), 37 -60 -119 and 37-60 -120, C.R.S., which <br />authc rize the CWCB to loan money for water projects from the CWCB Severance Tax <br />Trust Fund Perpetual Base Account for the benefit of the people of the state, provided <br />that tqie borrower assures repayment of that money. <br />Sect! n 37- 60- 122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$10, 00,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Asse biv. <br />SECTION i1- BOARD APPROVAL <br />At its eptember 2008 meeting, the CWCB approved a loan from the Severance Tax Trust <br />Fund erpetual Base Account to the BORROWER in an amount up to $1,000,800 for PROJECT <br />costs, not to exceed 90% of the cost of the PROJECT, with a loan origination fee of 1% in <br />actor ance with CWCB Policy No. 16, at an interest rate of 2.5% per annum for a <br />repay ent term of 30 years. <br />CWC 3 will disburse funds under two contracts 1) $523,584 (including the 1 % Loan <br />Servi (a Fee) for: preliminary engineering; the water rights purchase of 6.0 shares of <br />Greeley Irrigation Company; the purchase and installation of measuring control structures <br />on the wells; and the construction of the recharge facility; and 2) upon water court <br />appro al of augmentation plan, $487,224 (including the 1% Loan Service Fee) for the 50 <br />Aaaendix 1 to Loan Contract C150273 <br />