My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150273 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150273 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 9:39:03 AM
Creation date
9/19/2013 8:57:57 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150273
Contractor Name
Ogilvy Augmentation Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. PROJECT PROVISIONS <br />1. Con truction Fund Program Procedures. During the completion of the PROJECT, the <br />BOR OWER shall adhere to the CWCB Construction Fund Program Procedures <br />(Se n 8), of the Project Summary. <br />2. Eligi le Expenses. The PROJECT expenses for which the BORROWER is eligible for <br />loan disbursements are listed in Eligible Expenses (Section 9) of the Project <br />3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br />Disbt irsement Schedule (Section 10) of the Project Summary. <br />4. Time for Performance. The BORROWER recognizes that time is of the essence in the <br />perfo ance of all of Its obligations under this contract. Therefore, the BORROWER shall <br />complete the PROJECT within the time specified in Time for Performance (Section 11) of <br />the Project Summary. <br />5. Indei inification By The Construction Firm. The BORROWER shall require all <br />Cons Tuction Firms and their subcontractors to indemnify the STATE and the BORROWER <br />agair st all liability and loss, and against all claims and actions based upon or arising <br />out o damage or injury, including death, to persons or property, caused by any acts or <br />omis ions of those parties or sustained in connection with the performance of any <br />contr ct related to the PROJECT or by conditions created thereby, or based upon any <br />viola on of any statute, ordinance, or regulation, and the defense of any such claims or <br />6. Liability insurance During Construction. During construction of the PROJECT, the <br />BOR ' ER shall require the construction firm(s) and any subcontractors to maintain the <br />folio ng insurance coverage in the limits shown during the term of their contracts for <br />the nstruction of the PROJECT. The BORROWER shall provide the CWCB with an <br />Aco Form 27 evidencing said insurance prior to commencement of construction, <br />main ined until construction is complete, and shall provide the CWCB with <br />docu entation of renewals of said insurance. No payments shall be made to the <br />Bo WER unless all insurance certificates are current. <br />a. B�Idees risk insurance for construction in progress for all perils of loss including fire, <br />wind, hail, and vandalism in an amount equal to the completed value of the <br />b. Worker's compensation and employer's liability insurance in the required statutory <br />c. A omobile liability insurance that includes coverage for all owned, non -owned and <br />hle d vehicles with minimum limits of $1,000,000 combined single limit for bodily <br />in ry and property damage. <br />d. C mercial general liability insurance with minimum limits of $1,000,000 combined <br />se limit for each occurrence and $2,000,000 general aggregate. This insurance <br />c rage shall include products /completed operations and bodily injury/property <br />Loan Contract C150273 <br />
The URL can be used to link to this page
Your browser does not support the video tag.