My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ELCO_RateStudy_75%ProgReport
CWCB
>
Water Efficiency Grants
>
Day Forward
>
ELCO_RateStudy_75%ProgReport
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2013 10:58:01 AM
Creation date
9/13/2013 10:58:01 AM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Implementation Grant
Contract/PO #
OE PDA 13-104
Applicant
East Larimer County Water District
Project Name
Water Rate Study
Title
75% Progress Report
Date
8/25/2013
County
Larimer
Water Efficiency - Doc Type
Interim Reports
Document Relationships
ELCO_RateStudy_FinalReport
(Message)
Path:
\Water Efficiency Grants\Day Forward
ELCO_RateStudy_Invoices
(Message)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ilittAZIVW <br /> AUG 292013 <br /> Colorado 4ASA ?nlr <br /> _ ® Conservation Board <br /> Memorandum <br /> East Larimer County Water District <br /> To Ben Wade, Office of Water Conservation & Drought Planning CWCB <br /> From: Melissa Tremelling, East Larimet County Water District <br /> Webster Jones, P.E., Water Consulting Group <br /> Date: August 25, 2013 <br /> Subject: 75%Progress Report for East Larimer County Water District Rate Study <br /> Water Efficiency Grant#PO 13000000104 <br /> This memorandum has been prepared to provide the status of work performed to date on the water <br /> rate study for East Larimer County (ELCO) Water District. The water rate study is being partially <br /> funded by a Water Efficiency Grant administered by the Colorado Water Conservation Board: <br /> (OE PDA 13000000104). <br /> Task 1.3 —Cost-of-Service Analysis —July 15 to August 9 <br /> The rate model was finalized and cost-of-service adjustments were calculated. Wholesale <br /> cost-of-service calculations presented unique challenges due to contractual provisions and <br /> allocation methodologies utilized in past rate studies. <br /> Preliminary results indicate the amount of revenue collected from residential customers <br /> needs to increase by approximately 7%to accurately reflect their cost-of-service. Mobile <br /> home customers are currently paying more than their cost-of-service. The necessary <br /> adjustment to monthly minimum charges to more accurately reflect cost-of-service for <br /> mobile home customers is being discussed with District staff. Revenue from other customer <br /> categories is within 5%to 10% of cost-of-service. <br /> Task 1.4—Preparation of Draft Reports—August 10 to August 24 <br /> k draft report is being prepared to describe the following: (1) background information on <br /> Vl;S1t�Y end <br /> rry <br /> (2.) cost-of-service methodology and wholesale cost allocation, (3)revenue requirements, <br /> (4) cost-of-service calculations, and (5) rate design. <br /> Task 1.4—Meetings, Reporting to CWCB and Presentations to Board <br /> On August 19, the consultant discussed preliminary results with District staff and obtained <br /> direction on rate alternatives. The 50% Progress Report was submitted to CWCB on July <br /> 15. A preliminary draft and summary of the analysis will be presented to the District Board <br /> on September 10. <br /> 232 South Link Lane, P.O. Box 2044 • Fort Collins, Colorado 80522 • Phone (970)493-2044 • Fax (970) 493-1801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.