Laserfiche WebLink
STATE OF COLORADO <br /> Colorado Water Conservation Board P.stiR`oNS L <br /> Department of Natural Resources o . <br /> 1313 Sherman Street,Room 721 <br /> Denver,Colorado 80203 o..11 R- <br /> Phone:(303)866-3441 w ' <br /> Fax:(303)866-4474 • ),(-74.;. <br /> www.cwcb.state.co.us ••!9 31 • <br /> John <br /> January 14, 2013 Go emokenlooper r <br /> Mike King <br /> DNR Executive Director <br /> The Greenway Foundation <br /> Gimbel <br /> Attn: Mr. Jeff Shoemaker,Executive Director Jennifer L. <br /> CWCB Director <br /> 1040 S. Gaylord Street, Suite 201 <br /> Denver CO 80209 <br /> RE: Denver South Platte River Implementation Project—Frontier/Overland <br /> Final Design in the Metro Basin River Basin <br /> Dear Jeff, <br /> This letter is to inform you that the contract for the WSRA grant request to assist in the <br /> Denver South Platte River Implementation Project—Frontier/Overland Final Design in the Metro <br /> Basin River Basin was signed on January 11,2013. A signed original contract will be mailed to <br /> you. <br /> With the executed contract, you are now able to proceed with the project and begin <br /> invoicing the State of Colorado for costs incurred through December 31, 2013. Upon receipt of <br /> your invoice(s), the State of Colorado will provide payment no later than 45 days. I wish you <br /> much success in your project. <br /> Sincerely, <br /> /s/ <br /> Chris Sturm <br /> Stream Restoration Coordinator <br /> Watershed and Flood Protection Section <br /> Colorado Water Conservation Board <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 721 <br /> Denver,Co 80203 <br /> Phone:(303)866-3441 ext.3236 <br /> Fax:(303)866-4474 <br /> chris.sturm(a state.co.us <br /> www.cwcb.state.co.us <br /> 2 <br /> Dc- p <br /> /� rj{I <br /> Interstate&Federal•Watershed&Flood Protection•Stream&Lake Protection•Finance <br /> Water Information•Water Conservation&Drought Planning•Water Supply Planning <br />