My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150360 Feasibilty Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150360 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2015 8:03:37 AM
Creation date
7/23/2013 10:26:33 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-141
C150360
Contractor Name
East Mesa Water Company
Contract Type
Loan
Water District
38
County
Pitkin
Garfield
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EIII Wk FAMILMN' Uri'& W1 k' "CW III1i 11111 <br />ReeeptIon #: 796893 <br />12/30/2010 03:38:46 PM Jean Rlberico <br />6 of 24 Roo Feo :$126,00 Doc Fee:0.00 GpjtFIELD COUNTY CO <br />[Signature page — Agreement and Plan of Merger] <br />CERTIFICATION <br />The undersigned, as the presidents of East Mesa Water Company and Crystal River East <br />Mesa Ditch Company, respectively, hereby certify that the foregoing Agreement and Plan of <br />Merger has been approved by the Boards of Directors of the foregoing corporations and has been <br />approved by the requisite number of members of each company as required by Section 7 -31 -103 <br />of the Colorado Revised Nonprofit Coltporation. <br />Dated as of the 22°6 day of October, 2010. <br />East Mesa Wate Company <br />a Colorado MW Ach col] <br />By: <br />Name: <br />Title: <br />3 <br />v2 bou <br />Crystal River East Mesa Ditch Company, <br />a Colorado npo�root oorpomtA <br />By: <br />Name: <br />Title: <br />
The URL can be used to link to this page
Your browser does not support the video tag.