My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150350 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150350 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 3:53:49 PM
Creation date
7/18/2013 11:36:42 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-005
C150350
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
20
County
Rio Grande
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 5 — SCHEDULE OF EXISTING DEBT <br />None. <br />SECTION 6 - COLLATERAL <br />The COLLATERAL provided for this loan, as evidenced by the DEED OF TRUST, in the <br />form attached as APPENDIX 5 shall be an undivided one hundred percent (100 %) <br />interest in the Santa Maria Siphon and Canal System Rehabilitation Project including <br />the conveyance system, the open channel, the pipeline and the siphon, as more <br />particularly described in the attached DEED of TRUST ( "COLLATERAL "). <br />SECTION 7 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />None. <br />SECTION 8 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. Engineering contracts, plans and specifications must be submitted to the CWCB <br />staff for verification of compliance with the terms of this CONTRACT when available <br />prior to bidding. Any modifications to the plans and specifications must be approved <br />in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37 -87 -105 C.R.S., the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable construction firms, which said construction firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this CONTRACT, the BORROWER may issue the notice to proceed to the <br />construction firms. <br />G. The BORROWER shall conduct a pre- construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br />Appendix 1 to Loan Contract C150350 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.