My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Repayment
CWCB
>
ALP Project
>
Repayment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
6/18/2013 11:01:00 AM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />2 w <br />3 o <br />4 fo <br />5 c <br />6 O] <br />7 of <br />8 A <br />9 th <br />10 cc <br />I1 fu <br />12 <br />13 <br />14 <br />15 <br />16 at <br />17 PI <br />18 pc <br />19 cc <br />20 di <br />21 nj <br />(b) The Project Operations Committee consisted of representatives from those entities that <br />-rc identified by the Settlement Act, as amended, to receive a water allocation and the Bureau <br />Reclamation. This committee determined an appropriate entity to contract with Reclamation <br />the operation, maintenance, and replacement (OM &R) of the Project Works and developed a <br />nmon understanding among the project beneficiaries of the appropriate level of annual <br />4 &R activities to be performed on the Project Works to assure the Project's long term <br />- rational integrity and public safety. This committee was essentially replaced by the <br />sociation who subsequently entered into an OM &R contract with Reclamation. Ultimately, <br />Association will oversee the ongoing OM &R activities of the Project Works, providing <br />isultation and coordination among Association members on such items as annual OM &R <br />iding, maintenance schedules, and public safety issues. <br />4. MEASUREMENT AND RESPONSIBILITY FOR DISTRIBUTION OF STATUTORY <br />WATER ALLOCATION <br />(a) The water released or bypassed for the State pursuant to this contract shall be measured <br />outlet works of Ridges Basin Dam, and /or in the Animas River at the Durango Pumping <br />with measuring facilities installed by the United States as a part of the Project. Additional <br />of diversion directly from Lake Nighthorse may be made in the future by the State after <br />iltation and approval of the United States. Water delivered at these additional points of <br />;ion on Lake Nighthorse shall be measured at those points of diversion by facilities <br />ded by the State or its subcontractors. Water will be available at the outlet works of Ridges <br />22 Bain Dam and /or the Animas River in such quantities as the State determines, subject to <br />23 cabacity limitations of the relevant facilities, to ensure that the State annually receives a <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.