My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Yampa - Town of Rangely Flow Study_Scope of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Yampa - Town of Rangely Flow Study_Scope of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2014 1:48:49 PM
Creation date
6/17/2013 1:38:38 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Yampa/White
Applicant
Town of Rangely
Description
Rangely Raw Water Irrigation Flow Study/Design
Account Source
Basin
Board Meeting Date
1/14/2013
Contract/PO #
OE13IBC000015
WSRA - Doc Type
Contract Documents
Document Relationships
Yampa - Town of Rangely Flow Study_App
(Attachment)
Path:
\WSRF Grant & Loan Information\DayForward\SOUTHWEST & YAMPA
Yampa - Town of Rangely Flow Study_BRT Support Ltr
(Attachment)
Path:
\WSRF Grant & Loan Information\DayForward\SOUTHWEST & YAMPA
Yampa - Town of Rangely Flow Study_Notice to Proceed
(Message)
Path:
\WSRF Grant & Loan Information\DayForward\SOUTHWEST & YAMPA
Yampa - Town of Rangely Flow Study_Purchase Order
(Message)
Path:
\WSRF Grant & Loan Information\DayForward\SOUTHWEST & YAMPA
Yampa - Town of Rangely Flow Study_Summary
(Attachment)
Path:
\WSRF Grant & Loan Information\DayForward\SOUTHWEST & YAMPA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Method/Procedure <br /> • Engineering Analysis. <br /> • Hydraulic Model. <br /> Deliverable <br /> • Hydraulic Model. <br /> TASK 2—MASTERPLAN OF FUTURE SYSTEM <br /> Description of Task <br /> • Investigate the feasibility and desirability of creating an upper pressure zone for the system. <br /> • Discuss the feasibility and desirability of connecting the east and the west systems. <br /> • Expand the distribution system to include service to all possible individual properties within the <br /> Town. <br /> • Determine which components need to be ulisized to accommodate the increased demand, <br /> • Create a cost for a phased upgrading of the entire system. <br /> Method/Procedure <br /> • Engineering Analysis. <br /> • Hydraulic Model, <br /> Deliverable <br /> • <br /> • Hydraulic Model, <br /> • Written Masterplan/Report. <br /> REPORTING AND FINAL DELIVERABLE <br /> Reporting:- The applicant shall provide the CWCB a progress report every 6 months,beginning from <br /> the date of the executed contract. The progress report shall describe the completion or partial <br /> completion of the tasks identified in the statement of work including a description of any major issues <br /> that have occurred and any corrective action taken to address these issues. <br /> Final Deliverable: At completion of the project,the applicant shall provide the CWCB a final report <br /> that summarizes the project and documents how the project was completed. This report may contain <br /> photographs, summaries of meetings and engineering reports/designs. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.