My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150058A Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150058A Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2013 9:58:05 AM
Creation date
6/11/2013 8:58:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150058A
Contractor Name
Dolores Water Conservancy District
Contract Type
Loan
Water District
71
County
Dolores
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(4) determine the Selected Plan for the first phase of WETPACK to be constructed in the <br />next few years to meet the current water demands, <br />(5) and describe the Selected Plan. <br />For various financial and technical reasons, not all of the identified water demands can be met at <br />the present time. The water uses that can be served at the present time are described in the <br />Selected Plan as the "first phase" of WETPACK. Future phases of WETPACK are expected to <br />require the construction of facilities to meet other demands identified in this report. <br />Chapter 11 of this feasibility report describes the Selected Plan for which the DISTRICT is <br />requesting funding from the CWCB in fiscal year 2002 (July 2001 to June 2002). The facilities <br />that may be included in future phases of WETPACK are summarized as alternatives in Chapter <br />10. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.