Laserfiche WebLink
All easerr <br />404 perm <br />the Army <br />Permitting <br />nts and rights of way have been arranged. The Company expects to be exempt from <br />ing by statutory exemption, 33 CFR Section 323.4(a) 3. This will be confirmed with <br />orps of Engineers. <br />Financial Analysis <br />The Miss uri Heights - Mountain Meadow Irrigation Company will be the lead for the financing, <br />design, a d construction of the project and will be the entity entering into contracts and <br />agreeme is with the various entities for the services provided by each. <br />Entities tfjat are, or may be, involved in the design, construction, and financing of the project <br />include: I <br />1. Missouri Heights - Mountain Meadow Irrigation Company; financing and project <br />man gement. <br />2. Natu al Resources Conservation Service (NRCS); design, and construction. <br />3. Colo do Water Conservation Board (CWCB); financing and construction, <br />Several a tities will be involved in financing the estimated total project cost of $550,000. The <br />Missouri I ieights - Mountain Meadow Irrigation Company is applying for a loan from the CWCB <br />in maximi im amount of $450,000.00, to accommodate the 100% Company cost share. The <br />actual or estimated amounts by entity are given in Table 2. <br />Funding <br />Ditch Cor <br />Colorado <br />Revolvinc <br />Total <br />The Miss <br />the estim <br />The Miss <br />for 30 -ye. <br />annual pc, <br />fund the E <br />Table 2. Sources of Funding <br />(actual as of 1 -31 -2013) <br />ources: <br />pany funds $100,000.00 <br />Hater Conservation Board <br />Loan $450,000.00 <br />$550,000.00 <br />Heights - Mountain Meadow Irrigation Company will cover any costs that exceed <br />project cost. <br />iri Heights - Mountain Meadow Irrigation Company is requesting $*5"00.00 loan <br />from th a standard agriculture ding -rate would bO4 %�esulting in <br />'nents f $24,458. o this would be add ((d $2,44§,per year for the first 10 years to <br />iergency reserve account, for a total annua cost of $26,903. estaimated <br />