Laserfiche WebLink
Construct spillway <br />Install measuring devices <br />Clean -up site, comply with USFS requirements <br />• Estimated cost: $72,092. <br />Blanche Park Reservoir is in the final stage of the permitting, the <br />process of which has been borne by the District at a cost of $61,600. Status <br />of permitting is shown below: <br />• Dam Design: 100 %, final Mylar sheets are at Colorado State <br />Engineer office for sign -off <br />• Access Design: 90 %. USFS indicates minor changes at intersection <br />of USFS 125 may be necessary <br />• Wetlands Mitigation Study: 100% Awaiting US Army Corps of <br />Engineer approval <br />• Timber Cutting Evaluation: Yet to be performed by USFS <br />• US Fish I Wildlife Study: 100% <br />• NEPA Studies 100% <br />This application provides data to support the District's request for <br />necessary financing to complete Peak Reservoir and rebuild the dam at <br />Blanche Park Reservoir. <br />