My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153348 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153348 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2013 10:04:03 AM
Creation date
4/30/2013 1:32:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153348
Contractor Name
Morrison, Town of
Contract Type
Loan
Water District
9
County
Jefferson
Bill Number
SB 80-67
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. <br />C. <br />d. <br />Morrison. The line will continue in Red <br />Rocks Vista Drive and Red Rocks Vista Lane <br />to the elevated storage tank. A new 6 -inch <br />line will run from the 8 -inch line at the <br />intersection of Red Rocks Vista Drive and <br />Lake to connect with the existing 6 -inch <br />water line approximately 450 feet east in <br />Red Rocks Vista Drive. <br />In summary, the pipeline would be: <br />(1) <br />940+ L.F. 10" D.I.P. <br />(2) <br />1385+ L.F. 8" D.I.P. <br />(3) <br />480+ L.F. 6" D.I.P. <br />(4) <br />20+-3/4" services <br />Water Meters <br />Water meters will be installed for every <br />individual service in town. <br />Existing Clear Water,_,Storage Facilities <br />The town's two steel water storage tanks will <br />be deeded to the State, as follows: <br />(1) 250,000 Gal. tank near water treat- <br />ment plant. <br />(2) 110,000 gallon tank elevated storage <br />tank. <br />Raw Water Transmission Line from Raw Water <br />Reservoir to Water Treatment Plant <br />This line will be converted from a portion of <br />the existing 6 -inch and 4 -inch water pipeline <br />running from the treatmenjoplant to the <br />elevated storage tank. -inch connections <br />will be made on each he A pump <br />station will be con t p raw water <br />from the reservoir of upstream <br />of the water treatme p <br />In summary, these i <br />(1) <br />(2) <br />(3) <br />(4) <br />Pump stati <br />290+ L.F. <br />1120+ L.F. <br />800+ L.F. <br />6" D.I.P. <br />existing 6" <br />existing 4" <br />D.I.P. <br />D.I.P. <br />3. Permit periodic inspection of construction by <br />authorized representatives of the State during construction <br />and permit the State to review and approve or disapprove any <br />contracts for the construction of the project or the performance <br />of work pursuant to such contracts or subcontracts. <br />4. Without expense to the state, manage, operate, and <br />maintain the project system continuously in an efficient and <br />economical manner, and assume all legal responsibility for <br />such management, operation and maintenance. <br />5. Make the services of said project available within <br />its capacity to all persons in the Contractor's service area <br />without discrimination as to race, color, religion or natural <br />origin at reasonable charges, including assessments, taxes <br />or fees in accordance with a schedule of such charges, <br />whether for one or more classes of service, formally adopted <br />Page 2 of 6 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.