Laserfiche WebLink
CHAPTER 2 <br />DEVELOPMENT OF ALTERNATIVES <br />2.1.1.2.6 Regional Municipal and Industrial Water Supply <br />Projected population growth within the project area will increase the demand for water, both for <br />household use and for commercial, industrial, recreational, and community infrastructure requirements. <br />Dornbusch (1999) displays how population in the three - county area (La Plata and Montezuma Counties <br />in Colorado and San Juan County in New Mexico) has changed between 1970 and 1998. La Plata <br />County population doubled in that time period, and the population of Montezuma and San Juan Counties <br />has nearly doubled. Figure 2 -1 graphically depicts this information. The regional water use is computed <br />from the population growth using the nationwide average domestic water use of 179 gallons per capita <br />per day. <br />Figure 2 -1. Regional Population and M &I Water Needs (La Plata, Montezuma and San Juan Counties) <br />180,000 <br />7800,000197o <br />Rates 160,000 <br />98 =2.5% 30 =1.9% 140,000 100 =1.6% N 120,000% ,z <br />C 100,0004 a <br />°- 500,000 3 <br />° 80,000 4 — <br />a c <br />o 400,000 0 <br />0. <br />CM <br />60,000 <br />300,000 <br />40,000 <br />200,000 <br />20,000 <br />100,000 <br />0 <br />0 <br />1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080 2090 2100 <br />Year <br />2.1.1.2.7 Instream Leasing <br />In addition to the above uses of water identified in Dombusch (1999), the Colorado Ute Tribes could <br />elect to leave project water in one or more of the streams or rivers in the project area, and lease it for <br />enhancement of in- stream values. For example, the Ute Mountain Ute Tribe could elect to negotiate <br />lease terms to release water into the Dolores River to benefit fisheries. <br />2.1.1.3 Summary of Municipal and Industrial Water Uses by Colorado Ute Tribes <br />and Other ALP Project Beneficiaries <br />Table 2 -2 contains a summary of projected M &I water uses and depletions by the Colorado Ute Tribes <br />and other ALP Project beneficiaries. <br />2.1 INTRODUCTION AND BACKGROUND 2 -8 <br />