My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Animas-La PLata Project Environmental Impact Statement
CWCB
>
ALP Project
>
Animas-La PLata Project Environmental Impact Statement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/24/2013 1:49:06 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHAPTER1 <br />INTRODUCTION, PURPOSE OF, AND NEED FOR THE PROJECT <br />Table 1 -1 (continued) <br />Provisions of the Colorado Ute Indian Water Rights Settlement Act', <br />The Ute Mountain Ute Tribe Received From this Source of Water For the Following Purpose <br />Reserved water rights of- <br />1,850 afy storage n <br />2 cfs' <br />3.5 cfs` <br />Stollsteimer Creek <br />Stollsteimer Creek <br />Stollsteimer Creek <br />Agricultural irrigation <br />Reserved water right for direct flow <br />Piedra River <br />Irrigation of 535 acres <br />diversions of 1,595 afy' <br />Reserved water rights of: <br />Devil Creek <br />Irrigation of 81 acres <br />183 afy <br />1,530 afy° <br />San Juan River <br />Irrigation of 510 acres <br />975 afy° <br />Round Meadow Creek <br />Irrigation of 325 acres <br />1,372 afy` <br />Cat Creek <br />Irrigation of 482 acres <br />Water right of 2,000 afy` In reservation Beneficial use of tributary <br />groundwater for future individual <br />domestic and livestock wells <br />'The Southern Ute Indian Tribe and the Ute Mountain Ute Tribe also have rights to 2013 afy and 1080 afy respectively that <br />they have used under their historical irrigated acreage that is not included in the Colorado Ute Indian Water Rights Final <br />Settlement Agreement. <br />'Numbers shown in this table are for diversion and storage amounts. Allowable depletions are not shown. <br />'This right has an 1868 priority date, but is subordinated to all rights with an adjudication date prior to 1985. In order for the <br />Tribe to utilize any significant water from this right, a storage reservoir would be required to store any excess water that is not <br />utilized by water right holder with priority dates prior to 1985. The depletion allowance for this water right is not included in <br />the biological baseline for the San Juan River and Section 7 consultation on the use of the water may be required before the <br />water could be put to use. <br />'This right has an 1868 priority date, but is subordinated to all rights with an adjudication date prior to 1985. The depletion <br />allowance for this water right is not included in the biological baseline for the San Juan River and Section 7 consultation on <br />the use of the water may be required before the water could be put to use. <br />`The depletion allowance for this water right is not included in the biological baseline for the San Juan River and Section 7 <br />consultation on the use of the water may be required before the water could be put to use. <br />'As set forth in the 1930 federal decree and the 1934 state decree, except as modified by the Colorado Ute Indian Water <br />Rights Final Settlement Agreement. <br />.As per Reservoir No. 1, Appropriation Priority No. 1965 - 1, decreed in Civil Action No. 1848 -13, La Plata County. <br />'Storage right at Pargin Reservoir. 2nd refill right subordinated to 1986. The depletion allowance for this water right is not <br />included in the biological baseline for the San Juan River and Section 7 consultation on the use of the water may be required <br />before the water could be put to use. <br />'This right has an 1868 priority date, but is subordinated to all rights with an adjudication date prior to 1986. The depletion <br />allowance for this water right is not included in the biological baseline for the San Juan River and Section 7 consultation on <br />the use of the water may be required before the water could be put to use. <br />iThis right has an 1868 priority date, but is subordinated to all rights with an adjudication date prior to 1976. The depletion <br />allowance for this water right is not included in the biological baseline for the San Juan River and Section 7 consultation on <br />the use of the water may be required before the water could be put to use. <br />1 -7 1.2 PROJECT HISTORY <br />
The URL can be used to link to this page
Your browser does not support the video tag.