Laserfiche WebLink
E <br />Ll It would require an extended and uncertain time frame to secure the settlement benefits, which <br />would affect the ability to finalize the settlement; and <br />Q It would substantially impact Indian trust water rights by using the remaining capacity of the <br />Navajo Reservoir, a facility designed to supply these demands, thus creating a likely conflict <br />with the Navajo Nation and Jicarilla Apache Tribe. <br />On the basis of this overall evaluation, it was determined that Refined Alternative 4 would best meet the <br />ALP Project purpose and need. Accordingly, Refined Alternative 4 was designated as Reclamation's <br />Preferred Alternative. <br />Tables ES -3 and ES -4 summarize the water supply and project cost projections for the Preferred <br />Alternative. <br />1 <br />1 <br />I <br />Table ES -3 <br />Water Supply and Costs <br />Preferred Alternative <br />Allocation of ALP Project Water <br />Entity <br />Source of Water <br />Depletion (afy) <br />Southern Ute Indian Tribe <br />Animas River/Ridges Basin Reservoir <br />19,9808 <br />Ute Mountain Ute Tribe <br />Animas River/Ridges Basin Reservoir <br />19,9808 <br />Navajo Nation <br />Animas River/Ridges Basin Reservoir <br />2,340 <br />Animas -La Plata Water <br />Conservancy District <br />Animas River/Ridges Basin Reservoir <br />2,600 <br />San Juan Water Commission <br />Animas River/Ridges Basin Reservoir <br />10,400 <br />Subtotal <br />55,300 <br />Allowance for Reservoir <br />Evaporation <br />1,800 <br />Total Depletion <br />57,100 <br />8 Support for recently introduced federal legislation indicates that the Colorado Ute Tribes may agree to a reallocation of <br />5,280 afy depletion to the State of Colorado and 780 afy depletion to the La Plata Conservancy District in New Mexico. <br />Through implementation of the $40 trillion water acquisition fund, the Colorado Ute Tribes could acquire an additional <br />13,000 afy depletion. <br />Table ES-4 <br />Total Costs for Preferred Alternative <br />Cost <br />Item <br />Description <br />(Million) <br />Project Components <br />Ridges Basin Dam <br />Consists of 120,000 acre -foot reservoir with a conservation <br />$145.0 <br />pool of 30,000 acre -feet. Included in the cost of the dam are <br />costs of relocations for County Road 211, gas pipelines, and <br />electrical transmission facilities. <br />ES -10 <br />