My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Animas-La PLata Project Environmental Impact Statement
CWCB
>
ALP Project
>
Animas-La PLata Project Environmental Impact Statement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/24/2013 1:49:06 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
List of Tables <br />xxiii <br />Page No. <br />241 <br />Alternative 9 Impacts to Environmental Resource Areas ......................... <br />2 -71 <br />242 <br />Alternative 9 Evaluation of Capability of Alternative to Meet the Purpose and Need ... <br />2 -72 <br />243 <br />Alternative 9 Summary of Results of the Technical and Economic Factors ........... <br />2 -73 <br />2-44 <br />Alternative 10 Impacts to Environmental Resource Areas ........................ <br />2 -75 <br />2-45 <br />Alternative 10 Evaluation of Capability to Meet Purpose and Need ................. <br />2 -75 <br />2-46 <br />Alternative 10 Summary of Results of the Technical and Economic Factors .......... <br />2 -76 <br />2-47 <br />Summary of Significant Environmental Impacts of the Alternatives ................ <br />2 -83 <br />2-48 <br />Summary of the Capability of Alternatives to Meet the Purpose and Need <br />2-49 <br />Requirements............ .................. ...........................2 -85 <br />Summary of Technical and Economic Factors ... ............................... 2 -89 <br />2 -50 <br />Refined Alternative 4 Structural and Non - Structural Components Depletions ......... 2 -97 <br />2 -51 <br />Refined Alternative 4 Summary of Water Sources and Amounts from Storage and <br />2 -52 <br />Purchase of Water Rights ................... ............................... 2 -98 <br />Water Supply by Use for the Structural Component of Refined Alternative 4 ......... 2 -99 <br />2 -53 <br />Total Costs Refined Alternative 4 ........... ............................... <br />2 -123 <br />2 -54 <br />Summary of Average Annual Operating Costs For Full Project Operation Ridges <br />Basin Dam and Reservoir, Durango Pumping Plant, and Ridges Basin Inlet Conduit .. <br />2 -126 <br />2 -55 <br />Summary of Annual Operating Navajo Nation Municipal Pipeline ................ <br />2 -127 <br />2 -56 <br />Refined Alternative 6 Summary of Sources and Amounts of Water ................ <br />2 -131 <br />2 -57 <br />Future Water Use and Average Diversion and Depletion Summary for Refined <br />Alternative 6 M &I Use at 50 Percent Efficiency ............................... <br />2 -132 <br />2 -58 <br />Capital Costs Refined Alternative 6 .......... ............................... <br />2 -145 <br />2 -59 <br />Comparison of Navajo Nation Municipal Pipeline Alternatives ................... <br />2 -154 <br />2 -60 <br />Alternative NNMP -1 Impacts to Environmental Resource Areas .................. <br />2 -155 <br />2 -61 <br />Alternative NNMP -1 Summary of Results of Technical and Economic Factors ....... <br />2 -155 <br />2 -62 <br />Alternative NNMP -2 Impacts to Environmental Resource Areas ................... <br />2 -156 <br />2 -63 <br />Alternative NNMP -2 Summary of Results of Technical and Economic Factors ....... <br />2 -157 <br />2-64 <br />NNMP -3 Impacts to Environmental Resource Areas ........................... <br />2 -158 <br />2 -65 <br />Alternative NNMP -3 Summary of Results of Technical and Economic Factors ....... <br />2 -158 <br />2 -66 <br />Refined Alternative 4 and Refined Alternative 6 Future Water Uses and Acreage <br />2 -67 <br />Affected............................ .. ..............................2 <br />Refined Alternative 4 Approximation of Potential Acreage Impacted by Construction <br />-160 <br />and Operation of Lateral Pipelines ........... ............................... <br />2 -161 <br />2 -68 <br />Refined Alternative 6 Acreage Impacted by Construction and Operation of <br />2 -69 <br />Lateral Pipelines ......................... ............................... <br />Comparison of Refined Alternative 4 and Refined Alternative 6 .................. <br />2 -162 <br />2 -168 <br />3.1 -1 <br />Agricultural Land Assumptions Associated with Land Acquisition Under the Non - <br />3.24 <br />Structural Components ...................... ............................... <br />Summary of Future Without Project (Baseline) Depletions in the San Juan River Basin <br />3 -2 <br />.. 3 -6 <br />3.2 -2 <br />Modeled Diversion and Depletion Summary for Refined Alternative 4 With All <br />M &I Use at 50 Percent Efficiency ............. ............................... <br />3 -8 <br />3.2 -3 <br />Modeled Diversion and Depletion Summary for Refined Alternative 6M &I Use at 50 <br />3.2-4 <br />Percent Efficiency .............................. .......................3 <br />Mean, Minimum and Maximum Monthly Average Flow of the Animas River at Three <br />-15 <br />Locations for Future Conditions with and without the Project ..................... 3 -21 <br />3.2 -5 <br />Mean Monthly Flows for the San Juan River at Four Corners, New Mexico <br />(USGS Gage) with Refined Alternative 4 and without (Baseline Condition) Project <br />for the Modeled Period 1929 -1993 <br />........... ............................... <br />3 -24 <br />xxiii <br />
The URL can be used to link to this page
Your browser does not support the video tag.