N <br />mechanical equipment fabrication and installation, partially resulting from the electrical <br />re- design, are being addressed. These challenges resulted in some of the float, built into <br />There are currently some issues with the mechanical seal water system, the Contractor <br />has elected to install larger pumps in an effort to prove that the system installed meets the <br />specification requirements. Operations are being monitored to determine if these pumps <br />meet the specification requirements. There are other minor issues involving the cooling <br />water system, the main pump and motor units, the piping, the strainers, and the fish <br />screen cleaner. The issues are relatively minor in some instances, but may require some <br />additional work or redesign efforts prior to transfer to O &M status. There are some <br />issues with the seals on units #2, #4 and #8. <br />resolve these issues.' The pump manufacturer was on -site in August and reviewed the <br />installation of the seals. Findings from that visit are beingz reviewed <br />Additional studies have shown that the Obermeyer Crest Gates will not operate properly <br />in the conditions in the Intake Structure. The differential required in the water surface <br />across the gates is not available during normal operating conditions. The use of air as a <br />medium to operate the Obermeyer Gates will not work. A temporary system utilizing <br />water as the operating medium has been installed for operations this season. Other <br />alternative hoisting systems for the gate leafs are being evaluated. <br />The installation of a trash rake system is being evaluated for the intake structure. <br />Preliminary results are expected in futureAttgusi. <br />It appears that the Solids Exclusion Bushings on pumps 5 through 8 were not installed in <br />the factory. The pump manufacturer is preparing a proposed remedy. <br />4-+ UNKNOWN GROUND CONDITIONS: The ° ntFaet°" for- the Her- izei #al <br />Direetion Drilling eentraet has eneountered eendifiens that they believe are a differ-in <br />site eendifien. We& was dela5,ed for- one month while plans wer-e fennulated. A tr-eneh <br />was exeavated thfough the sands and gr-avels above the bedr-eek to expose the pe <br />where the dr-ill hole exits the bedr-eek. One large sandstone bouldef was eneountered. No <br />agreement on if this one boulder- represents a differing site eenditien. Proposals teta4ng <br />$1.3 million have been submitted for elaimed impaets due to this issue. instaflatien of <br />the 14DD pipe has been satisfaetefily eempleted. The potential differ-ing site eendi <br />elai has been resolved. New or unknown utilities along alignment ofthe NNMP <br />uaaaa 11uJ vVVarIti JVTrV�T' <br />continue to require realignment of portions of the pipeline <br />T CULTURAL RESOURCE MITIGATION: The final field season has been completed. <br />Some minor field work for clearance of the boundary fencing remains to be completed. <br />NAGPRA related burials have been completed and documentation of project findings is <br />ongoing. At least one human burial has been found within the excavation limits of a <br />portion of the NNMP. Work has stopped in this area until the Nava10 Nation Tribal <br />Historic Preservation O, facer has reviewed the work at the area. <br />