Laserfiche WebLink
Animas - La Plata Water Supply and Demand Study <br />capa ity. Bay field's demand was calculated to be about 500 AF based on the population of 2,000 people in <br />towr and the 220 gpcd utilized in SWSI. <br />BroN rn and Caldwell discussed future water resource plans for Bayfield with Dirk Nelson, Town Attorney. <br />He ' 1i idicated that getting A -LP Project Water from Lake Nighthorse would be a huge obstacle in utilizing A- <br />LP Y roject water. Bayfield has not approached the Tribe about leasing water from them, but this is a <br />3.441.7 Town of Ignacio, Colorado <br />The rown of Ignacio (Ignacio) is surrounded on three sides by the Southern Ute Reservation. Ignacio has a <br />popi lation of about 700 people and purchases potable water from the Southern Utes off of the Vallecito <br />Rest rvoir. In discussions with Balty Quintana, Ignacio's Town Manager, and Dirk Nelson, Town Attorney, it <br />woti d be highly unlikely that Ignacio would purchase A -LP Project water from the State because they would <br />not i 7ant to upset their relationship with the Tribe and use of this water would require the construction of a <br />wate r treatment plant. <br />&7 <br />:N J .� r; f i,'�I� � r .2fec,P p n: P ai A,- �,a ium'I.A „luny r nal RPFport.doex <br />