Section 2 Animas — La Plata Water Supply and Demand Study <br />amount of $34,674,406 ($6,719,900 + $27,954,506 = $34,674,406). This represents approximately $3,315 per <br />AF or $10.17/1000 gallons). <br />IDC will stop accruing once the Project is transferred from construction status to operation and maintenance <br />(O &M) status. The IDC costs that have been accrued as of that date will then be treated as capitalized costs. <br />With the current schedule, the USBR anticipates transfer from construction to O &M status to occur <br />sometime in 2011 (email from Patrick Page, USBR, to Leo Eisel, 12.14.09). <br />The amount of capital cost on which IDC is calculated, is further explained in note 5, Appendix B. <br />2.5 COLORADO'S FIXED O &M COSTS <br />There will be O &M costs associated with the purchase of A -LP Project water. It is the State's intention to <br />transfer responsibility for these costs to the water providers who will purchase a portion of the State's <br />allocation. These O &M costs will be collected and managed by the Animas -La Plata Operations and <br />Maintenance Association. <br />Annual fixed O &M costs are estimated to be approximately $1,200,000, of which Colorado would pay <br />$126,000 (10.5 percent, see note 6, Appendix B) if it buys its full allocation; this includes an annual <br />contribution to an emergency and replacement reserve fund. <br />2.6 OTHER ( "VARIABLE ") O&M COSTS <br />Other O &M costs associated with pumping have been estimated by the Colorado Water Conservation Board <br />(CWCB) to be approximately $250,000 /year assuming it had to pump its entire allocation to Lake Nighthorse <br />(see note 7, Appendix B). <br />2.7 SUMMARY OF O &M COSTS <br />Therefore the total of Fixed and Variable O &M Costs is estimated to be approximately $376,000 per year in <br />2009 dollars or approximately $35.95 per AF /YR or $0.11 / 1,000 gallons if the State were to purchase the <br />entire 10,460 AF. <br />2.8 SUMMARY <br />The above discussion does not cover the entire subject of cost reimbursement for Bureau of Reclamation <br />Projects in detail. The above data and information, however, should provide sufficient cost information with <br />which to further explore interest among municipal water suppliers in the A -LP Project area in acquiring <br />additional raw water supply from the State of Colorado's 10,460 AF share of the A -LP Project during 2010. <br />Therefore, it is suggested that a capital cost (including IDC) of $3300 per AF and an O &M cost of <br />approximately $36 per AF /YR be used in discussions with potential buyers. <br />The above information and data also indicate that the State could repay the capital costs and the IDC over a <br />40 -year period at an interest rate of 8.135 percent. <br />2 -2 <br />