Laserfiche WebLink
in the Fund that is not used to pay Variable OM &R costs as set forth in this <br />paragraph shall become part of the Fund principal. <br />7.03 Any funds in the Fund principal shall remain in the principal unless the Members <br />unanimously decide otherwise. <br />7.04 Variable OM &R costs for all Project participants except the City of Durango shall <br />be paid from the Fund to the extent such funds are available. In the event that the <br />annual income earned on funds in the OM &R Fund does not cover all such <br />Variable OM &R costs, the remaining costs shall be allocated among the Project <br />participants in accordance with Paragraph 8.02. <br />7.05 Under this document, the City of Durango will take its Project water in accordance <br />with Paragraph 4.04 and none of its costs will be covered by the Fund. In the event <br />the City of Durango agrees to take its Project water in accordance with the other <br />provisions of this document, i.e., to participate in the joint pool, its variable <br />OM &R costs shall be covered by the Fund in accordance with Paragraph 7.04. <br />8 Variable OM &R Costs. The Management Committee shall establish procedures for the <br />assessment and collection of the variable OM &R costs in excess of the costs paid pursuant <br />to Paragraph 7, consistent with the following principles: <br />8.01 Each Project participant shall be assessed its share of the projected variable OM &R <br />costs at least once a year and shall pay such charges within a reasonable time <br />period in advance of the water year. <br />8.02 Each Project participant shall be responsible for the actual Variable OM &R costs <br />for the Project water supply delivered to that Project participant. <br />8.03 "Variable OM &R costs" are the costs of power including energy consumption and <br />that share of power demand costs for the pumping of water not designated as Fixed <br />OM &R costs. <br />8.04 Variable OM &R costs attributable to a specific Project participant shall be paid for <br />by that Project participant. <br />9 Exclusions. The Association shall not be responsible for the OM &R of the Navajo Nation <br />Municipal Pipeline, the ALP Mitigation Area in the La Plata River Basin, or the costs <br />associated with those features. <br />10 Miscellaneous, The Parties agree to pursue as a group any administrative or judicial steps <br />required to assure that Project operations as set forth in this document are in conformity <br />with applicable law. Each Project participant has the right to make maximum beneficial <br />use of its respective Statutory Water Allocation so long as such use is consistent with <br />Page 6 of 7 <br />