Laserfiche WebLink
Committee shall cooperate with Project participants to meet those demands <br />whenever feasible and practical. <br />4.02 Whenever feasible and practical, Project participants shall take delivery of their <br />portion of the Project water supply by direct ALP diversions ( "River Water') <br />without putting it in storage. <br />4.03 The Project shall be operated to maintain a Joint Storage Pool for the benefit of all <br />Project participants. The Project water supply in the Joint Storage Pool shall be <br />allocated among Project participants whose water supplies will not be satisfied <br />from River Water. <br />4.04 Unless and until the City of Durango agrees to take its Project water in accordance <br />with the other provisions of this document, 2,133 acre feet of the active storage <br />capacity of the Reservoir shall be operated and accounted as the Durango Pool, <br />and the remainder of the active storage capacity shal I be operated and accounted <br />as the Joint Storage Pool. The Durango Pool, and all water stored therein, will be <br />available only for use by the City of Durango to supplement direct diversions <br />available to fulfill the City of Durango's annual Project water supply. Water <br />diverted into the Reservoir to fill or refill Project storage capacity will be allocated <br />to the City of Durango pro rata to the share the Durango Pool represents of total <br />active Project storage capacity; that is, of every acre foot of water diverted into <br />storage, 2,133/ 95,030 acre feet will be allocated and accounted to the Durango <br />Pool until Durango's 2,133- acre -foot cap is met, and the balance to the Joint <br />Storage Pool. Evaporation and seepage from Ridges Basin Reservoir will be <br />allocated to the Durango Pool pro rata to the share the Durango Pool represents of <br />the total active Project storage capacity. <br />4.05 A Project participant's unused allocations of Project water supply in the Joint <br />Storage Pool shall not be carried over in the month -to -month accounting. <br />4.06 Water otherwise available for diversion by the Project and passed by the Durango <br />Pumping Plant to meet federal environmental requirements for ALP shall be <br />available for direct diversion by Project participants downstream of the Durango <br />[lumping Plant, provided that such water is identified and accounted for as Project <br />water in accordance with Paragraphs 2 and 10. <br />4.07 A Project participant may elect to take delivery of less than its full Statutory <br />Water Allocation in any year without losing the right to delivery of its full <br />entitlement in future years. A Project participant's election to not take full <br />delivery of its Statutory Water Allocation shall not constitute evidence of an <br />intention to abandon the water right. <br />4.08 A Project participant may not take delivery of more than its Statutory Water <br />Page 2 of 7 <br />