My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Draft ALP Marketing Supply and Demand Study
CWCB
>
ALP Project
>
Final Draft ALP Marketing Supply and Demand Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 2:48:57 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Animas -La Plata Water Marketing Supply and Demand Study <br />4.0 <br />$2,400,000 <br />$96,000 J <br />$1,200,000 <br />$48,000 <br />- - - <br />--- - - - <br />- -..._ <br />_..---- ...._..._ <br />.................. .............................. <br />$1,150,000 <br />$46,000 <br />$1,000,000 <br />I <br />$40,000 <br />$800,000 <br />$32,000 <br />Association Variable OM &R Cost Fund Amount is $3,000,000 and generates the <br />$90,000 in Reclamation's OM &R estimate required to pump 5,000 AF annually. <br />Z $1.2 Million is amount left if State purchases 3,120 AF with its current $12.0 <br />million authorization. <br />Section 2 <br />Fixed OM &R Alternative 2. State Assigns All or a Portion of the Responsibility for Paying the <br />Fixed OM &R <br />Should another entity purchase the State Water, this entity would pay their share of the Fixed <br />OM &R costs directly to the Association. <br />A second variation would be to allow a third party willing to pay the Fixed OM &R costs in exchange <br />for other considerations. For example, a third party could agree to pay the Fixed OM &R costs <br />which would give them membership in the Association. Another example could be the formation <br />of a new organization, which for illustrative purposes only, we have elected to call the "Colorado <br />River Compact Compliance Organization." <br />Similar to the Capital Repayment Alternative 5, the State may allow water providers to pay a <br />portion, or all, of OM &R costs in exchange for the ability to use the State's Water to augment their <br />supplies as needed or in years of drought. This would require negotiations that are outside the <br />scope of this study. <br />Variable OM &R Costs <br />Variable OM &R costs are the costs required to pump water into Lake Nighthorse from the Animas River <br />by an entity using A -LP Project water. The Association is currently establishing a $3,000,000 Variable <br />OM &R Fund to pay these costs. If the fund is adequately financed, there will be no Variable OM &R cost <br />to pay. If the fund is not adequate, the State could consider the following options to make up any short <br />falls. <br />1. Establish an escrow account similar to that proposed for Fixed OM &R cost. The manner (time and <br />rate) in which a water provider takes its water will determine the variable costs. Given the many un- <br />certainties associated with Variable OM &R Costs this may not be the best utilization of limited funds <br />because funding may not be required every year and the Variable OM &R Fund may cover those <br />costs. <br />2. Assign Variable OM &R costs to the entity utilizing that portion of the State's allocation. <br />3. Obtain an annual appropriation from the State Legislature as necessary. <br />If the entire pool is utilized for compact compliance purposes, pumping will only be required in those <br />years when the pool is actually used for compact compliance purposes. <br />The State's responsibility for Variable OM &R costs is limited solely to paying for the pumping costs <br />associated with pumping the State's allocation to Lake Nighthorse. To reiterate, payment of Variable <br />OM &R costs may not be necessary in every year. Also, please remember pumping to replace <br />evaporation and seepage losses is a Fixed OM &R cost, not a Variable OM &R cost. <br />2 -14 <br />FINAL ALP Repo rt_1_13_11_1-L. Dorx <br />
The URL can be used to link to this page
Your browser does not support the video tag.