My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Draft ALP Marketing Supply and Demand Study
CWCB
>
ALP Project
>
Final Draft ALP Marketing Supply and Demand Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 2:48:57 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Animas -La Plata Water Marketing Supply and Demand Study <br />Section 2 <br />require additional funds to cover their variable OM &R costs at some point in the future as the Project <br />approaches full operation unless further accommodations are made to cover or share those costs. <br />Addressing this issue needs to be a key consideration during the development of future Association <br />policies and operating principles. <br />Payment Default <br />If an Association member's payments are in default, as described in Section 4.2 of the IGA, the <br />Association will withhold delivery of the member's project water until the default is cured by payment of <br />all amounts past due and any out -of- pocket expenses incurred by the Association. <br />2.4 Repayment Alternatives <br />Given the funding required to purchase A -LP Project water, Brown and Caldwell developed alternatives <br />for repaying Reclamation for the State's portion of A -LP Project water and for paying annual OM &R costs. <br />This section describes those alternatives. <br />Capital Cost Repayment Alternatives <br />Costs for the A -LP Project were presented in "Animas -La Plata Water Supply and Demand Study," (Brown <br />and Caldwell, February 24, 2010). To the extent possible these costs have been updated as described <br />in Section 2.2 and used in the repayment alternatives discussed in this section. <br />• Capital Costs: The latest available estimate of Colorado's share of the capital costs is $27,914,902 <br />(personal communication, Patrick Page, October 7, 2010). <br />• IDC: IDC on capital costs is updated quarterly and will continue to accrue until the State enters into a <br />repayment contract or otherwise provides the required funding. The State could enter into a <br />repayment contract with Reclamation immediately; however, because the State did not enter into a <br />repayment contract with Reclamation providing for upfront cost sharing in the project, IDC on <br />construction costs continues to accrue. <br />• To date (October 2010), Colorado's share of the IDC is $8,437,263 (personal communication, Patrick <br />Page, U.S. Bureau of Reclamation, October 7, 2010). Entering into a repayment contract now as <br />opposed to the time of "final cost allocation" may stop the clock on IDC charges but such would have <br />to be negotiated during development of the repayment contract. If the State is committed to <br />purchasing all or a portion of Project water it is in the State's best interest to stop the further <br />accumulation of IDC. <br />• For planning purposes in this report, the total repayment to the federal government for Colorado's <br />10,460 acre -feet is estimated to be $36.4 million, which is composed of $27.9 million in capital <br />costs, plus approximately $8.5 million in IDC costs. This estimate is based on presently available cost <br />data and needs to be updated as new capital cost and IDC data become available from Reclamation. <br />The next update of capital costs and IDC will occur on December 31, 2010. <br />Colorado House Bill (H.B.) 10 -1250 authorized the expenditure of up to $36 million from the Perpetual <br />Base Account of the Severance Tax Trust Fund towards the purchase of the State's 10,460 acre -feet of <br />A -LP Project water. The Bill authorized three separate $12 million installments from the Perpetual Base <br />Account Fund and appropriated the first $12 million installment. Therefore, if the State should choose <br />to enter into a repayment contract with Reclamation, this $12 million could be transferred to the Federal <br />Government as a down payment towards the purchase of all or a portion of the State's allocation. <br />The first $12 million installment appropriated in HB 10 -1250 will become available June 30, 2011. The <br />remaining $24 million will require future legislative appropriation, which could become available as <br />follows: <br />. 1St installment $12 million (appropriated) -available June 30, 2011; <br />2 -10 <br />FINAL ALP Report1_13_11_LL. Doox <br />
The URL can be used to link to this page
Your browser does not support the video tag.