Laserfiche WebLink
BOR730 as of 2 -28111 <br />SGL <br />FD <br />Project <br />C/A <br />Sum of Fiscal/ <br />Sum of/ <br />PROG /DESC <br />1711 <br />B10 <br />0069 <br />LD03 <br />$ <br />(25,311.66) <br />$ 42,756,168.13 <br />RIDGES BASIN DAM & RESERVOIR <br />1720 <br />B10 <br />0069 <br />0003 <br />$ <br />1,288,075.95 <br />$205,825,119.09 <br />RIDGES BASIN DAM & RESERVOIR <br />$ <br />23,557.6 <br />$ 1,091,919.87 <br />$ <br />1,262,764.29 <br />$ 248,581,287.22 <br />H <br />1720 121 <br />A <br />0050 <br />$ <br />1711 <br />B10 <br />0069 <br />L004 <br />$ <br />- <br />$ 62,392.88 <br />DURANGO PUMPING PLANT <br />1720 <br />B10 <br />0069 <br />0004 <br />$ <br />1,011,244.97 <br />$ 92,349,925.48 <br />DURANGO PUMPING PLANT <br />Total 121 <br />$ <br />1,011,244.97 <br />$ 92,412,318.36 <br />�Q <br />1711 <br />B10 <br />0069 <br />L005 <br />$ <br />- <br />$ 754,034.34 <br />RIDGES BASIN INLET CONDUIT <br />1720 <br />B10 <br />0069 <br />0005 <br />$ <br />76,677.73 <br />$ 21,801,983.37 <br />RIDGES BASIN INLET CONDUIT <br />$ <br />76,677.73 <br />$ 22,556,017.71 <br />G <br />1711 <br />B10 <br />0069 <br />L034 <br />$ <br />3,595.62 <br />$ 10,246,031.79 <br />NAVAJO NAT MUN PIPELINE <br />1720 <br />B10 <br />0069 <br />0034 <br />$ <br />7,525,330.56 <br />$ 41,322,768.76 <br />NAVAJO NAT MUN PIPELINE <br />$ <br />7,528,926.180 <br />$ 51,568,800.55 <br />1720 <br />B10 <br />0069 <br />0035 <br />$ <br />18,445.03 <br />$ 207,124.64 <br />PERMANENT OPERATING FACILITIES <br />`E <br />1720 <br />B10 <br />0069 <br />0036 <br />$ <br />660,878.k22 <br />$ 1,621,912.15 <br />LAKE NIGHTHORSE BOAT RAMP <br />Total B10 <br />$ <br />10,558,936.62 <br />$ 416,947,460.63 <br />1720 B20 <br />0069 <br />0003 <br />$ <br />23,557.63 <br />$ 1,090,919.87 <br />RIDGES BASIN DAM & RESERVOIR <br />1711 B20 <br />0069 <br />LD03 <br />$ <br />- <br />$ 1,000.00 <br />RIDGES BASIN DAM & RESERVOIR <br />$ <br />23,557.63 <br />$ 1,091,919.87 <br />Total B20 <br />$ <br />23,557.6 <br />$ 1,091,919.87 <br />H <br />1720 121 <br />0069 <br />0050 <br />$ <br />1,723,685.23 <br />$ 2,650,436.44 <br />(ARRA 2009)NAVAJO NATION PILNE <br />1720 121 <br />0069 <br />0060 <br />$ <br />404,532.71 <br />$ 745,183.62 <br />(ARRA 2009)PRMNT OPER.FAC(POF) <br />Total 121 <br />$ <br />2,128,217.94 <br />$ 3,395,620.06 <br />T:\FMD\Finance\IDC\0069-ALP\idc—animas as of 2- 28- 11.x1s <br />