Laserfiche WebLink
Note all features Include land costs sgl 1711 <br />1/ Excludes $10,138,018.00 land donation. <br />FY 08 <br />ALP COSTS BY FISCAL. YEAR <br />$16,776,759.13 <br />$20,507,026.01 <br />12,636,371.64 <br />7,317,999.42 <br />C/A M& FEATURES 1919 fundsl <br />FY 01 <br />FY 42 <br />FY 03 <br />FY 04 <br />FY 05 <br />FY 2006 <br />FY 07 <br />3 Ridges Basin Dam 8 Reservoir <br />$4,053,049.26 <br />$3,661,459.50 <br />$19,077,168.17 <br />$27,019,051,92 <br />$36,137,389.00 <br />$44,844,118..47 <br />$38,502,894.83 <br />4 Durango Pumping Plant <br />1,233,620.12 <br />2.607,114.48 <br />5,519,650.84 <br />4,192,633.26 <br />15,858.704.48 <br />15,939;571.33 <br />16,058,725.64 <br />5 Ridges Basin Inlet Conduit <br />277,692.34 <br />553,062.50 <br />650,536. t6 <br />268,247.82 <br />430,546.65 <br />985,410.24 <br />10,382,354.49 <br />34 Najajo Nat Municipal Pipeline <br />758,923.51 <br />129,659.58 <br />451,338.14 <br />1,017,570.80 <br />657,205.35 <br />869,485.51 <br />559,517.39 <br />35 Permanent Cperating Faalftles <br />6,090.34 <br />6,005.94 <br />36 Lake Nghthorse Boat Ramp <br />Total <br />6,323,285.23 <br />6,951,296.06 <br />25,698.693.31 <br />32.497,503.80 <br />53,083,844.48 <br />62.644,675.89 <br />65,509,498.29 <br />3 Ridges Basin Dam d Reservoir % <br />64.0972% <br />52.6730% <br />74.2340% <br />83.1419% <br />68.0761% <br />71.5849% <br />58.7745% <br />4 Durango Pumping Plant % <br />19.5092% <br />37.5054% <br />21 4783% <br />12.9014% <br />29.8748% <br />25.4444% <br />245136% <br />5 Ridges Basin Inlet Conduit % <br />4.3916% <br />7.9563% <br />2.5314% <br />0.8254% <br />0.8111% <br />1.5730% <br />15.8486% <br />34 Najajo Nat MunitipalPipetine <br />12.0020% <br />1.8653% <br />1,7563% <br />3.1312% <br />1.2381% <br />1_3880% <br />0.8541% <br />35 Permarieni Operating Facilities <br />0.0000% <br />0.0000% <br />0.0000% <br />0,0000% <br />0.0000% <br />0.00979/6 <br />0.0092% <br />36 Lake Nighthorse Boat Ramp <br />0.0000% <br />0.0000% <br />0.0000% <br />0.0000°k <br />0.0000% <br />0.0000% <br />0.0000% <br />Total % <br />100.00% <br />100.00% <br />100.00% <br />1011.00% <br />100.00% <br />10000% <br />100,00% <br />Note all features Include land costs sgl 1711 <br />1/ Excludes $10,138,018.00 land donation. <br />FY 08 <br />FY 09 1/ <br />$16,776,759.13 <br />$20,507,026.01 <br />12,636,371.64 <br />7,317,999.42 <br />6,809.579.37 <br />1,569,T, 1.09 <br />973,022.18 <br />11,275.697.38 <br />6,854.23 <br />53,013.77 <br />763.573.61 <br />37,202,586.55 <br />41,487,081.28 <br />45,0957% <br />49.4299% <br />33,9664% <br />17,6392% <br />18 3040 % <br />3.7838% <br />2.6155191, <br />27.1788% <br />0.0164% <br />0.1278% <br />0.0000% <br />1,8405% <br />100.00% 100.00% <br />FY 10 FY 11 --t Al <br />7,683,467.77 $1,262.764.29 ! A <br />3,425,629.67 1,011,244.97 <br />228,139.41 76,677.73 jG� <br />15,883,863.59 7,528,926.18 -10 / <br />109,481.10 18,445.03 _ <br />(160,166.98) 660.878.42F/ <br />27.370,414 56 10,558,936,62 �1G <br />28.80% 11.96% A <br />12.52% 9,58% Q <br />0.83% 0.73% G <br />58 03 % 7130% D <br />0.40% 0.17% <br />-0,59% 626% <br />100.00% 100.00 %. <br />3/29/2011 Computation IDC ALP -fund B10,xls CIP Features <br />