Laserfiche WebLink
Run #8 - Statutory Cap Indexed by Non- Indian, Non -Sunk, Joint Costs 6117/2n1 n <br />Lariaza conservancy District <br />0.808% <br />Animas - La Plata Project <br />0.978% <br />0.978% <br />0.913% <br />State of Colorado <br />Percentages for Reimbursable Interest <br />During <br />Construction <br />Calculation <br />1/ <br />Total Percentage for IDC <br />Costs at the Oct 2010 (I~Y2011) Price Level Using the Original May 2001 Allocation Process <br />7.448 016 . <br />7.523% <br />. 7.5'23 %o <br />Durango <br />Ridges Basin <br />Permanent <br />Lake Nighthorse <br />Pumping <br />Inlet <br />Operating <br />Sunk <br />Dam & Reservoir <br />Plant <br />Conduit <br />Facilities <br />Subtotal <br />Costs <br />Total <br />Total Costs <br />262,974,069 <br />117,093,161 <br />26,483,966 <br />3,283,000 <br />409,834,196 <br />68,025,806 <br />477,860,002 <br />Less Separable Costs <br />45,640,359 <br />•----------------------------------------------------------------- <br />1,162,296 <br />0 <br />0 <br />46,802,655 <br />- <br />30,202,002 <br />77,004,657 <br />Joint Costs <br />217,333,710 <br />115,930,865 <br />26,483,966 <br />- - - - -- --------------- <br />3,283,000 <br />- - - -- ------------- <br />363,031,541 <br />- - - - -- <br />37,823,804 <br />--------------- - -- <br />400,855,345 <br />x <br />x <br />x <br />x <br />x <br />Non - Indian Percent of Joints <br />18.88% <br />18.88% <br />18.88% <br />18.88% <br />18.88% <br />Non - Indian Joint Costs <br />41,037,947 <br />21,890,597 <br />5,000,824 <br />619,911 <br />68,549,279 <br />7,142,064 <br />75,691,343 <br />Indexed Repayable Joint Costs <br />40,837,354 <br />7,142,064 <br />47,979,418 <br />Distribution of Repayment <br />24,447,831 <br />13,041,043 <br />2,979,177 <br />369,304 <br />40,837,354 <br />7,142,064 <br />47,979,418 <br />LCD Percent of Joints <br />1.64% <br />1.64% <br />1.64% <br />1.64% <br />1.64% <br />LCD Indexed Repayment <br />2,125,424 <br />1,133,751 <br />259,001 <br />32,106 <br />3,550,283 <br />620,911 <br />4,171,193 <br />CO Percent of Joints <br />10.99% <br />10.99% <br />10.99% <br />10.99% <br />10.99% <br />CO Share of Repayment <br />14,223,994 <br />7,587,410 <br />1,733,315 <br />214,865 <br />23,759,584 <br />4,155,325 <br />27,914,909 <br />Lariaza conservancy District <br />0.808% <br />0.968% <br />0.978% <br />0.978% <br />0.913% <br />State of Colorado <br />A 5.409% <br />Q 6.480% <br />G 6.545% <br />O 6.545 %. <br />6.10811/0 <br />Total Percentage for IDC <br />6.217% <br />7.448 016 . <br />7.523% <br />. 7.5'23 %o <br />7.021% <br />1/ ALPWCD and SJWC have agreed to up -front payments to avoid IDC costs and are, therefore, not included. <br />1�3 <br />